Projects

Projects from 1977/2015
________________________________________
1 "Government Incentives for Small-Scale Industries Jointly With General Organization for Industrialization, For the Ministry Of Industry Planning Program, 1977-1978.
2 "Healthy Care Delivery Systems, for the Ministry of Health, 1977-1980.
3 "Improved Methods of Macroeconomic and Sectoral Planning", for the Ministry of Planning, 1977-1980.
4 "Housing and Construction Industry", for the Ministry Of Housing And Reconstruction, 1977-1980.
5 "Egyptian Labour Emigration, Ministries of Labour, Education, Economy, Planning, Health", The Central Agency For Mobilization And Statistics, and The Population And Family Planning Board, (1977-1981)
6 "Cairo Urban Transport Project", Jointly With Massachusetts Institute of Technology (MIT), USA And The Transport Planning Authority (TPA) And Cairo Transit Authority, 1977 – 1981.
7 "Cairo Transport Policies Project", Jointly Project with The Ministry Of Transportation, 1977-1981.
8 "General Groundwater Studies In Egypt", Ministry Of Land Reclamation, For The Ministry Of Desert Irrigation And Groundwater Research Institute, 1977-1982.
9 "Communication Needs For Rural Development", For The Ministry Of Transport And Telecommunications, 1977-1983.
10 "Urban Infrastructure Planning For Secondary Cities In Egypt", General Organization For Physical Planning, 1977-1983.
11 "Electric Power System, Planning And Economics", For The Ministry Of Electricity And Energy, 1977-1983.
12 "Engineering Applications For The Egyptian Plastics Industry", For The Ministry Of Petroleum, The National Plastics Company, The Egyptian Organization For Standardization And The Petroleum Gas Company, 1977-1986.
13 "Stochastic Models Of Nile River Hydrology", for The Ministry Of Irrigation, 1978-1984.
14 "Water Resources Planning And Management In Egypt", For The Ministry Of Irrigation, 1978-1986.
15 "Elements Of Water Resources Systems: Analysis And Planning (Workshop)", 1978-1986.
16 "Study Of "The Impact Of Changing Shop Opening Hours In Cairo On Traffic Demand And Patterns At The City Center", for Cairo Governorate. Jointly With Cairo Traffic Directorate And Cairo Governorate, 1979 – 1980
17 "Structure Plan For Al-Amal New Town", For The General Organization Of Physical Planning (GOPP), 1979 – 1982.
18 "Performance Of Paraffinic Asphalt-Cements In Road Construction", Jointly With The General Authority Of Roads And Bridges, Ministry Of Transport, The Egyptian Petroleum Research Institute And National Academy Of Science And Technology, 1979-1985.
19 "Performance of Paraffinic, Waxy Asphalt Cements In Egyptian Road Construction", Jointly With Massachusetts Institute of Technology (MIT), USA And Roadways And Bridges Authority, 1979-1985.
20 "Egypt Intercity Transport Project", Jointly With Massachusetts Institute Of Technology (MIT), USA and The Transport Planning Authority, 1979 – 1986.
21 "Replanning And Development Of El Fayoum City, Massachusetts Institute of Technology (MIT), USA And Cairo University For El Fayoum Governorate, 1980.
22 "Structural Planning Of El-Amal City", Massachusetts Institute Of Technology (MIT), USA And Cairo University For General Organization For Physical Planning,, (1980)
23 "Planning And Design Of Youth Village", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Ministry Of Housing , Reconstruction And Land Reclamation, 1980.
24 "Traffic Composition On The Main Artherial Around Greater Cairo", Massachusetts Institute Of Technology (MIT), USA And Cairo University For General Organization For Physical Planning (GOPP), 1980.
25 "The Study For A Tourist Company In Port Said", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Port Said Governorate, 1980.
26 "Social And Structural Aspects Of The Signal Population And Preperation Of A Structural Plan For Sinai Peninsula", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Ministry Of States For Scientific Research, 1980.
27 "Design And Mechanization Of Financial And Managerial Systems In Family Planning Organization", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Family Planning And Population Agency, 1980.
28 "Study Of The Cement Marked In Egypt, Massachusetts Institute Of Technology (MIT), USA And Cairo University For Egyptian Cement Office, 1980
29 "Education Information Systems", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Ministry Of Education, 1980.
30 "Study Of The Three Proposals Submitted For Port-Said Container Terminal", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Port-Said Governorate, 1980.
31 "Study Concerning The Organization Of Cultural Sector", Massachusetts Institute Of Technology (MIT), USA And Cairo University For The Ministry Of Culture Supreme Council Of Culture, 1980.
32 "Organizing The University Administration", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Cairo University, 1980.
33 "Traffic Counts On The Entrances Of Regional Highways Network In The Greater Cairo Region", for The General Organization Of Physical Planning (GOPP) Jointly With Ministry Of The Interior, 1980.
34 "Reconstruction And Flood Protection To Flood Stricken Villages In Upper Egypt", For The Ministry Of Planning, 1980.
35 "Hydrology And Water Balance Of The Machar Marshes", For Massachusetts Institute Of Technology (MIT), USA Planning Program, 1980 -1981.
36 "Water Benefits Analysis For Bahr El-Gabel Development Project", For Cairo University/ Massachusetts Institute Of Technology (MIT), USA Technology Planning Programme, 1980 – 1981.
37 "Optimum Policies For Maintenance Of The Delta Paved Road Network", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Roads And Bridges, Ministry Of Transport, 1980-1982.
38 "Resource Development And Policy: Petroleum", For The Ministry Of Planning And Ministry Of Petroleum, 1980-1983.
39 "Review And Additional Studies Of The Gisr El Suez And Central Nasr Bus Workshop, Massachusetts Institute Of Technology (MIT), USA And Cairo University For World Bank Of Construction And Development (WBCD) And Cairo Transport Authority (CTA), 1981.
40 "Improvement In Thomas Converter Practice At Egyptian Iron And Steel Company", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Egyptian Iron And Steel Company, 1981.
41 "Utilization of Some Fermentation Secondary Products", Joint Project Between Massachusetts Institute Of Technology (MIT), USA. And Cairo University, And El-Nasr Co. For Organic Chemistry, 1981.
42 "Pollution Flashover Of High Voltage Insulators", Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Electricity, 1981.
43 "Improvement Of The Quality Of Alloy Steels Used For Building And Machine Parts With The Purpose Of Replacing Imported Steels", Massachusetts Institute of Technology (MIT), USA And Cairo University For Delta Steel Company, 1981.
44 "The Economical Aspects Of Recycling The Drainage Water In The New Valley and The Western Desert Using Conventional And Non-Conventional Energy Sources, Massachusetts Institute of Technology (MIT), USA And Cairo University For New Valley Governorate, 1981.
45 "Technical Supervision Of Automated Bakery Construction", Massachusetts Institute of Technology (MIT), USA and Cairo University For Ministry Of Supply And Internal Trade, 1981.
46 "Flash Floods Hazard Prevention In Upper Egypt Villages: Case Study Of El Edwa Village, Aswan", Massachusetts Institute of Technology (MIT), USA And Cairo University For The Ministry Of Planning, 1981.
47 "Flash Floods Hazard Prevention In Upper Egypt Villages: Case Study Of Awlad Salama Village, Sohag", for The Ministry of Planning, 1981.
48 "Establishing Of Experts' Database", Supreme Council Of Universities, 1981-1982.
49 "Informatics and Accelerated Development", the Development Research and Technological Planning Centre (DRTPC), (Mini Project), 1981-1982.
50 "Demand for Manpower", Ministry for National Planning, 1981 – 1982.
51 "Feasibility Study of Cooling of Some Stories In Eastern Company And Offering A Training Course for The Company Staff, Eastern Company, 1981-1982.
52 "Upgrading The Archive of The Authority of The Administration Monitoring", The Authority of The Administration Monitoring., 1981 – 1982
53 "Upgrading The Archive Of The Authority Of The Administration Monitoring", The Egyptian Engineers Co., 1981 – 1982.
54 "Development Of Pharmaceutical Chemical Systems", for Ministry Of Health, And Egyptian Drug Organization, 1981-1982.
55 "Utilities Planning In The New Communities And Small Cities In Egypt', General Authority For Urban Planning, 1981 – 1982.
56 "Gypsum Quarrying and Product Manufacturing", Governorate of Fayoum, (Mini Project), 1981-1982.
57 "Foundation Analysis For Prefabricated Houses", Massachusetts Institute of Technology (MIT), USA And Cairo University For Prefabricated Houses Company, 1981-1982.
58 "Energy and Environmental Impact Studies of The Qattara Depression", for the Ministry of Electricity and Energy And Egyptian Meteorological Authority, 1981-1983.
59 "Production Planning Methodology for The Automotive Industry", for The Ministry of Industry and El Nasr Automotive Company (NASCO), 1981-1984.
60 "Energetic in the Egyptian Metal Industries", for The Ministry Of Industry, Egyptian Iron And Steel Company And Misr Aluminum Company, 1981-1986.
61 "Energy-Economy Interactions and Energy Policy", for the Ministry Of Planning and Ministry of Petroleum, 1981-1986.
62 "Effect of Manufacturing Processes on the Geometrical Accuracy Of Internal Combustion Pistons, Massachusetts Institute of Technology (MIT), USA And Cairo University for Helwan Engineering Industries, 1982.
63 "Studies of Air Quality At National Company For Cement Production at Helwan", Massachusetts Institute of Technology (MIT), USA And Cairo University for National Cement Company, 1982.
64 "Effect Of Soil Types On Cable Loading of Cairo Distribution Network", Massachusetts Institute Of Technology (MIT), USA And Cairo University for Electricity Distribution Company For Cairo, 1982.
65 "New Aluminium Cables Joining Method", Massachusetts Institute of Technology (MIT), USA and Cairo University For Egyptian Iron And Steel Company, 1982.
66 "Economy Wide Modelling And Social Accounting Matrix (SAM) Updating", Massachusetts Institute of Technology (MIT), USA And Cairo University For United States Agency For International Development And World Bank, 1982.
67 "Employment Of Women: Patterns And Demographic Change", Massachusetts Institute of Technology (MIT), USA And Cairo University For International Labour Organization (ILO) – United National Fund For Population Activities (UNFPA), 1982.
68 'Water And Energy Benefits From High Aswan Dam Downstream Storage", Massachusetts Institute of Technology (MIT), USA And Cairo University for The Ministry Of Irrigation – Water Research Center, 1982.
69 "Economic, Social And Cultural Characteristics Of Egyptian Pilgrims (Hajj Project)", Massachusetts Institute of Technology (MIT), USA And Cairo University For Pilgrimage Research Center , University Of King Abdel Aziz , Jeddah , Saudi Arabia, 1982 .
70 "Flash Floods Hazard Prevention In Upper Egypt Villages: Case Study Of Higaza Village, Quena", for he Ministry of Planning, 1982.
71 "Analysis of Water Resources Systems (Workshop)", 1982.
72 "Labour Emigration", Ministry of Planning, 1982-1983.
73 "Improvement Of General Planning Methods For The Economic System On Total And Sectional Levels", Ministry Of Panning, 1982-1983.
74 "Design And Automation Of Financial And Administration In The Family Planning And Population Agency", 1982-1983.
75 "Medical Care System In The Rural Areas", Ministry Of Health, 1982-1983.
76 "Improvement of Engineering Capabilities in Sugar and Distillation Company", Egyptian Sugar and Distillation Company, 1982-1983.
77 "Methods Of Benefiting Of Wastes In Oil Industries, Faculty Of Agriculture, 1982-1983.
78 "Inspection and Testing of Poly–Ethylene Pipes Used In Natural Gas Networks – Natural Gas Projects Company (Egypt Gas)", 1982-1983.
79 "Quality And Productivity Analysis Of Burnt Lime For BOF Process At Hadidsolb", Massachusetts Institute of Technology (MIT), USA And Cairo University For Egyptian Iron And Steel Company , Helwan, (1982-1983).
80 "Planning And Design Of Youth Villages (Planning & Design Of Future Road Network)", For The Research And Studies Organization, Ministry Of Housing & Development, 1982 – 1983.
81 "Development And Planning Of Fayoum Region (Transportation and Roads Planning)", For The General Organization Of Physical Planning (GOPP), 1982 – 1984.
82 "Present and Future Operating Scenarios For High Aswan Dam", Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Irrigation, Water Master Plan, 1983.
83 "Real Time Forecasting And Control For The High Dam, Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Irrigation, Water Master Plan, 1983.
84 "Protection Of The Open Railway Connection Serving Abu Tartur -Kena From Flash Floods", Egyptian Railway Authority (ERA), 1983
85 "Adaptive Close-Loop Operation Of The High Aswan Dam-Master Plan for Water Resources Development and Use", Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Irrigation-Water Master Plan, 1983
86 "Present and Future Operating Scenarios For High Aswan Dam", For United Nation -Development Program, Water Master Plan For Egypt, 1983.
87 "Protection Of The Open Railway Connection Serving Abu Tartur Phosphate Mines From Flash Floods", Massachusetts Institute of Technology (MIT), USA and Cairo University For Ministry Of Development And New Communities And Ministry Of Transportation, Communication And Maritime Transport, 1983)
88 "Data Management System for The Agency For Administrative Investigation Massachusetts Institute of Technology (MIT), USA And Cairo University For Agency For Administrative Investigation, (Egypt Administrative Control Authority), 1983.
89 "A Study Of Iron Melting And Energy In Induction Furance, Massachusetts Institute of Technology (MIT), USA And Cairo University For Deltah Steel Mill Company, 1983.
90 "Solution for Some Manufacturing Problems In Boiler Industry", Massachusetts Institute of Technology (MIT), USA And Cairo University For Nasr Boiler And Pressure Vessel Manufacturing Company, 1983.
91 "Oil And Gas Potentialities In The Western Desert Of Arab Republic Of Egypt, Massachusetts Institute of Technology (MIT),), USA And Cairo University For General Petroleum Authority, 1983.
92 "Foundation Analysis For Prefabricated Houses, Massachusetts Institute of Technology (MIT), USA And Cairo University For Prefabricated Houses Company, 1983.
93 "Design And Manufacture Of Small Propeller-Type Wind Machine, Massachusetts Institute of Technology (MIT), USA And Cairo University For Aircraft Factory (Helwan) Arab Organization For Industrialization , 1983.
94 "A Study On The Characteristics Of Surface Treated Components", Massachusetts Institute of Technology (MIT), USA And Cairo University For Helwan Aircraft Factory (Factory 36), 1983.
95 "Utilization Of Egyptian Raw Materials For The Production Of Square Tubes For Bus Body Construction, Massachusetts Institute of Technology (MIT), USA And Cairo University For El-Nasr Automotive Manufacturing Company, 1983.
96 "Pelletization of Baharia Iron Ore, Massachusetts Institute of Technology (MIT), USA and Cairo University For Iron And Steel Company (Helwan), 1983.
97 "Detection of Oil Leak Location In Oil Filled Cables", Massachusetts Institute of Technology (MIT), USA And Cairo University For Cairo Electricity Distribution Company, 1983.
98 "Optimization of Transportation In Open Pit Mines With Particular Reference To Baharya Oasis Iron Ore Mines", Massachusetts Institute of Technology (MIT), USA And Cairo University For Iron And Steel Company, 1983.
99 Energy Management Computer Program At Hadidsolb, Massachusetts Institute of Technology (MIT), USA And Cairo University For Egyptian Iron & Steel Company Helwan, 1983.
100 "The Use of Agriculture Development Technology in Desert Land Reclamation", Faculty Of Agriculture, 1983-1984
101 "Rehabilitation of the City of El Arish Water Distribution System", Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry of Development And Land Reclamation, 1983-1984.
102 "Developing and Studying a stochasting model for the Nile River", Ministry of Water Resources and irrigation, 1983-1984.
103 "Regional Groundwater Studies In Egypt", for The Ministry Of Irrigation, 1983-1984.
104 "Building a Mathematical Models For Planning Of The Water Resources Of River Nile, Ministry Of Irrigation, 1983-1984.
105 "Study Of Silting Of Lock KM 61 Of El-Nubaria Canal", Massachusetts Institute of Technology (MIT), USA and Cairo University For General River Transport Authority, Ministry Of Transport And Ministry Of Irrigation, 1983-1984.
106 "East Owienat Ground Water Reservoir Evaluation", Massachusetts Institute of Technology (MIT), USA And Cairo University for General Petroleum Company (GPC), 1983-1984.
107 "Groundwater Resources of West Delta Aquifer System", Massachusetts Institute of Technology (MIT), USA And Cairo University For General Authority For Rehabilitation Projects And Agricultural Development (GARPAD), 1983-1984.
108 "Optimum Distribution Models for Water", For Ministry Of Irrigation, United Nations Project), 1983-1984.
109 "The Practical Application of the Agriculture Hydrology in Egypt", for Ministry of Water Resources and Irrigation, 1983-1984.
110 "Supplying Sadat City with Drinking Water from the Ground Water of West Delta Aquifer, for Ministry of Development, New Communities and Land Reclamation, 1983-1984.
111 "Pre-Feasibility Study On Utilization Of Nile Sediments In South High Aswan Dam Lake, Water Researches Center", Ministry Of Irrigation, 1983-1984.
112 Study Of Short-Term Traffic Management Schemes Fox Roxy Area At Heliopolis", For The General Organization For Physical Planning (GOPP) 1983-1984.
113 "Protection Of The 15th Of May City From Flash Floods", Jointly With Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Development And New Communities And Ministry Of Transportation , Communication And Maritime Transport, 1983-1984.
114 "3rd Conference On Urban Transport In Developing Countries (CODATU - III)", For The CODATU Association In Paris In Cooperation With The Ministry Of Transport, 1983 – 1986.
115 "Quality And Productivity Analysis Of Burnt Lime For BOF Process At Hadidsolb", Massachusetts Institute of Technology (MIT), USA And Cairo University For Egyptian Iron And Steel Company , Helwan, 1984.
116 "Cooling System For Sinter Lines", Massachusetts Institute of Technology (MIT), USA And Cairo University For Egyptian Iron And Steel Company, Helwan, (1984).
117 "Elevated Traffic Routes In Helliopolis", Massachusetts Institute of Technology (MIT), USA And Cairo University For Governorate Of Cairo, (1984).
118 "Optimum Design Of River Navigational Vessels Of Egypt", Massachusetts Institute of Technology (MIT), USA and Cairo University For Ministry Of Transport And Ministry Of Irrigation, 1984.
119 "Flash Flood Studies For New Menia City", Massachusetts Institute of Technology (MIT), USA and Cairo University For Ministry Of Rehabilitation And Land Reclamation, 1984.
120 "The Problem Of The Lack Of Irrigation Water To The Farms Located On The Shores Of The High Aswan Dam Lake South Of Aswan", Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Rehabilitation And Land Reclamation, 1984.
121 "Use Of Egyptian Raw Materials For Bus Body Construction", Massachusetts Institute of Technology (MIT), USA And Cairo University For El Nasr Automotive Manufacturing Company (NASCO), 1984.
122 "East Owienat Ground Water Reservoir", Massachusetts Institute of Technology (MIT), USA And Cairo University For General Petroleum Company (GPC), 1984-1985.
123 "Design Of A Prototype Of A VLSI Electronic Digital Exchange", National Institute For Wired And Wireless Communication, 1984-1985.
124 "Transportation Of The Billets In The Egyptian Iron And Steel Company". For Egyptian Iron And Steel Company, 1984 – 1985.
125 "Increase Of Sodium Sulphate Production At The Egyptian Sugar Company", Massachusetts Institute of Technology (MIT), USA And Cairo University For Egyptian Sugar Company (Hawamdiya), 1984-1985.
126 "Optimum Design Of Floor (Pavement) For El Sawah Garage, Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Transport And General Transport Organization For Cairo City, 1984-1985.
127 "Long Term Planning Of Electrical Energy Projects in Egypt", Ministry Of Electricity, 1984-1985.
128 "Development Of Resources And Polices, Ministry Of Petroleum", 1984-1985.
129 "Railway Freight Service Planning And Marketing", For Egyptian Railway Authority (ERA) Of The Ministry Of Transport, 1984-1985.
130 "Consulting and Technical Services In Geometric Design And Traffic Engineering In Heliopolis Area", in Cooperation With The Corps Of Engineers, for Cairo Governorate, 1984 – 1985.
131 "Agricultural Hydrology And Land Reclamation, For Cairo University/ Massachusetts Institute of Technology (MIT), USA Link Program, 1984 – 1989.
132 "Agricultural Hydrology and Land Reclamation", for The Ministry Of Irrigation, National Research Centre, And Egyptian Meteorological Authority, 1984-Ongoing.
133 "El-Obour Master Plan Study", Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Development, New Communities And Land Reclamation, 1985.
134 "Planning Distribution Models For Egyptian Irrigation Network", Massachusetts Institute of Technology (MIT), USA And Cairo University For Ministry Of Irrigation, Water Master Plan, 1985.
135 "Recovery Of Cryolite From Carbon Foam", Massachusetts Institute of Technology (MIT), USA And Cairo University For Misr Aluminum Company, (1985).
136 "The Causes Of The Collapse Of Khozam Dam At Quena Governorate By The Effects Of The 13th April 1985 Flash Flood", Massachusetts Institute of Technology (MIT), USA and Cairo University For United Nations Development Program (UNDP), 1985.
137 "Performance Improvement For Conveying System Of Sinter Raw Materials, Massachusetts Institute of Technology (MIT), USA And Cairo University For Egyptian Iron And Steel Company, Helwan, 1985.
138 "Study Of The Welding Technology For Polyethylene Gas Pipes", Massachusetts Institute of Technology (MIT), USA And Cairo University For Egypt Gas Company, 1985.
139 "Interaction between Energy and Economy", Ministry of Petroleum, 1985-1986.
140 "Use Of Computer In Energy Management in The Egyptian Iron And Steel Company", Egyptian Iron And Steel Company, 1985-1986.
141 "Demonstration Of Solar Pond Technology In Egypt", for The Ministry Of Electricity And Energy, Egyptian Metrological Authority, and El Nasr Saline Company In Alexandria, 1985-1986.
142 "Electrical Supply For Arc Furnaces", Massachusetts Institute of Technology (MIT), USA And Cairo University, For Egyptian National Metal Company, (1985-1986)
143 "Structural Planning of El-Amal City", for General Organization, For Physical Planning, 1985-1986.
144 "Structural Planning of El Fayoum City", for El Fayoum Governorate, 1985-1986.
145 "Preparation of The Standards and Priorities for Renovation And Upgrading The Urban Planning of The Existing Cities", General Authority For Urban Planning, 1985 – 1986.
146 "Railway Freight Service, Planning And Marketing", for Egyptian Railway Authority (ERA) and The Ministry Of Transport, 1985-1986.
147 "Groundwater Resources Evaluation Of West Delta Aquifer System", Massachusetts Institute of Technology (MIT), USA And Cairo University For General Authority For Rehabilitation Projects And Agricultural Development (GARPAD), 1985-1989.
148 "Design Of Prototype Digital Exchange, National Institute Of Telecommunications", For The Ministry Of Transport And Telecommunications, 1985-Ongoing.
149 "Design Of Water Well Field For El Sadat City", Massachusetts Institute Of Technology (MIT), USA and Cairo University For Ministry Of Development, New Communities And Land Reclamation And General Authority For Rehabilitation Project And Agricultural Development (GARDAD), (1986)
150 "Pre-Feasibility Study On Utilization Of Nile Sediments In Naser", for Nile Research Institute, Ministry of Irrigation, 1986.
151 "Procedures And Applications Of Estimating Solar Resources", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Arab Industrial Authority, 1986.
152 "Solution Of Welding Problems In Egyptian Boilers Manufacturing Industry", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Nasr Boiler And Pressure Vessel Manufactruing Company, 1986.
153 "Pre-Feasibility Study And Cost Estimation Of Thrbomachinery Equipment For A Novel Thermal Power Cycle Utilizing Heat From a Solar Ponds", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Ministry Of Electricity And Energy, 1986.
154 "Pre-Feasibility Study And Cost Estimation Of Heat Extraction Systems For A Novel Thermal Power Cycle Utilizing Heat From Solar Ponds", Massachusetts Institute Of Technology (MIT), USA And Cairo University For Ministry Of Electricity And Energy, 1986.
155 "Performance Improvement of Egyptian Prefabricated Houses Companies, Prefabricated Houses Company In Helwan", The General Authority For Construction, 1986.
156 "Utilization of Edible Oil Factories Byproducts, Cairo Oil And Soap Company", 1986.
157 "Rationalization Of Urban Planning", for General Organization For Physical Planning, 1986-1987.
158 "Review And Additional Studies Of The Gisr El Suez And Central Nasr Bus Workshop, Massachusetts Institute Of Technology (MIT),USA And Cairo University For World Bank Of Construction And Development (WBCD) And Cairo Transport Authority (CTA), 1986-1987.
159 "Study Of Communication Needs For Rural Regions", For The Ministry Of Transport And Telecommunications, 1986-1987.
160 "Analytical Models for the Study Of Intercity Transportation Policies", for the Ministry of Transportation, 1986-1987.
161 "Urban Transportation Policy", For Ministry Of Transportation, 1986-1987.
162 "The Using Of, Waxy Asphalt in Road Construction", for The Ministry of Transportation, 1986-1987.
163 Maintenance Programmes Of The Delta Road Networks, For The General Authority For Roads, Bridges And Land Transport, (GARBLT), Ministry Of Transport, (1986-1987).
164 "Improving the Performance Of Bagasse Fuel Boilers, for The Sugar And Integrated Industries Company", 1986 – 1997.
165 "Technology Of Developing Agriculture In Desert Soil, For The Ministry Of Agriculture, Ministry Of Housing And Development, El Khattara Project, El Salhia Project, Ramsis Project And Greenco Agriculture Project, 1986-Ongoing.
166 "Protection Of White Cement Factory Near Beni-Khaled Village, Samalut Area, Against Flash Floods", Massachusetts Institute Of Technology (MIT), USA and Cairo University For Ministry Of Transport And Transport Planning Authority (TPA), 1987.
167 "Economic Plunger Study For The Improvement Of Nile River Transport Fleet", for The General Authority For River Transportation, Ministry Of Transport (1987 – 1988).
168 "Reasoning Of Degradation Of Freight Transport Volume Of Egyptian Railways for The Ministry Of Transport And Egyptian National Railways, 1987 – 1988.
169 "Cairo Metro Interchange Coordination Study", Jointly With SOFRETU, Paris, For Ministry Of Transport, (1987 – 1988).
170 "Structure Plan For The New Settlement No. 7 Around Greater Cairo, (Planning Of Future Road And Public Transport Networks", For The General Organization Of Physical Planning (GOPP), (1987 – 1990).
171 Protection Of Suez International Park From Flash Floods, For The Ministry Of Development And New Communities, (1988).
172 Environmental Pollution By Agriculture Chemicals In Giza Governorate, For Giza Governorate, (1988-1989).
173 Development Of The Engineering Capabilities At The Egyptian Sugar Company, The Egyptian Sugar Company, (1988-1989).
174 "Production Of The End Part Of The Pressurized Vessels, El-Nasr Company", For Boilers And Pressurized Vessels, 1988 – 1989.
175 "Methods Of Industrial Quality Control", The United Nations Development Programme (UNDP), 1988-1989.
176 "Establishment Of A Unit For Repairing And Developing Of Electronic Boards", For The Egyptian Sugar And Distillation Company, 1988-1989.
177 "General Survey For Students Of Manawat Village And Abou Nomros Schools", For Giza Governorate, 1988-1989.
178 "Rationalization Of Using And Circulation Of Insecticides In The Egyptian Village", For Giza Governorate, 1988-1989.
179 "The Using Of Information Technology For Services Development In Cairo University", For Cairo University, 1988-1989.
180 "Characteristics Of Phase I Of Cairo Regional Metro Line (Helwan/Moubarak) And Analysis Of Mode Choice On The Helwan/Ramsis Corridor", Jointly With INRETS, France, (1988 – 1990)
181 Protection Of New Beni Suef City From Flash Floods, For The Ministry Of Development And New Communities, (1989).
182 Protection Of Cement Factory Near Keft, Quena Against Flash Floods, For The Portland Cement Company, Helwan, (1989-1990).
183 Rationalization And Improvement Of The Efficiency Of Energy Use, Tibbin Institute Of Metallurgical Studies Union Of Egyptian Industries, Becktel International Company, (1989-1990).
184 "Study And Design Of Distillation Tower In The Egyptian Sugar And Distillation Company", The Egyptian Sugar And Distillation Company 1989-1990.
185 Development Of The Design Of Freezed Meat Mincer (HS250), Egyptian Company For Inter-National Meat Products (Fresh Food Int), (1989-1990).
186 Study Of The Reasons For The Breakdown Of Dima Locomotive Axel, Egyptian Sugar And Distillation Company, (1989-1990).
187 Study Of Thermal Expansion Of Turbine Exhaust Pipes In Sugar Company Factories, Kous, Egyptian Sugar And Distillation Company, (1989-1990).
188 Design Of Models Of Agricultural Equipments Suitable For Small Farms, Giza Governorate, (1989-1990).
189 Development Of Farm Irrigation Systems Industrial – Agricultural Equipments Suitable For Small Farms, Giza Governorate, (1989-1990).
190 Study Of Reducing Ground Water Level In Shabramant Village, Giza Governorate, (1989-1990).
191 Study Of Increase Of Flow And Velocity On Ataka Power Station Inlets And Exits, Suez, Egyptian Electricity Authority, (1989-1990).
192 "Transportation On Egypt’s Road Network", Jointly With SOFRETU, Paris, For The Transport Planning Authority (TPA), The Ministry Of Transport, (1989 – 1990).
193 Power Factor Improvement Projects (1), Seven Up Company, Cairo, (1989 – 1990).
194 Power Factor Improvement Projects (2), Arab Contractors Medical Center, (1989 – 1990).
195 Construction Of High Efficiency Aluminium Melting Project, Arab Aluminium Company, Ismailia, (1989 – 1994).
196 Combustion Control, Auriant Glass Company, (1989-1994).
197 High Efficiency Lighting Project And Energy Management System In Large Hotels, Ramsis Hilton In Cairo, (1989-1995).
198 Protection Of King Khaled Autostrade From Flash Floods, For The Ministry Of Development And New Communities, (1990)
199 "Study Of Transportation And Roads Problems In A Local Unit In Giza Governorate", Cairo University, (1990)
200 "Development Of River Fight Transport Fleet, Egyptian National Institute For Transport, (1990-1991).
201 "Improvement Of The Performance Of Portland Ferry, Portland Cement Company, Helwan, (1990-1991).
202 "Study The Effect Of Flyovers On Traffic", Jointly With The Transport Planning Authority And The Central Traffic Directorate For The Academy Of Scientific Research And Technology, (1990 – 1991).
203 "Construction Of Co-Generation Unit Project Elu-Misr Company, (1990 – 1992).
204 "Development Of Energy Management System Project, Ebico Pharmacy Company, 10th Of Ramadan City, (1990 – 1993).
205 Protection Of 7th Community Around Cairo From Flash Floods, For The Ministry Of Development And New Communities, (1991)
206 "Upgrading Cairo University Campus And Dormitories Internal Streets & Improving Traffic Circulation & Parking Schemes", For Cairo University, (1991)
207 "Green House Research Project at Desert Regions", 1991-1992.
208 "Study the Effect of Ground Water on the Ancient Egyptian Monuments", Center of Egyptian Engineer for Researches and Studies, 1991-1992.
209 Sanitary Water Treatment, Industrial Construction And Services Company, Ariscom, (1991-1992).
210 Estimation Of Suitable Power And Torque For Heavy Tracks, Public Sector For Engineering Industries, (1991-1992).
211 Planning And Model Operation For Martin Furnaces, National Company For Metallurgical Industries, Abou Zaabal, (1991-1992).
212 Industrial Quality Control In The Egyptian Sugar And Distillation Company, Egyptian Sugar And Distillation Company, (1991-1992).
213 Development Of Engineering Abilities In Sugar Company (Second Phase), Egyptian Sugar And Distillation Company, (1991-1992).
214 "Establishment Of A Center For Repairing And Developing Of Electronic Boards", In The Egyptian Sugar And Distillation Company, (Second Phase)", 1991-1992.
215 "Rationalization Of Using And Circulation Of Insecticides In The Egyptian Village, (Second Phase)", For Giza Governorate, 1991-1992.
216 "Dentistry Hygiene In Arab Republic Of Egypt, National Project, 1991-1992.
217 "Removal Of Acid And Lead Vapors In National Plastic Company", Industrial Construction And Services Company Ariscom, 1991-1992.
218 "Examination Of Electro-Static Filter", Industrial Construction and Services Company, Ariscom, 1991-1992.
219 "Methanol Project, For Egytalc Project", For Egyptian Italian Company For Engineering And Construction, 1991-1992.
220 "Air Pollution Prevention In Transport And Engineering Company", Alex, Assembly And Industrial Services Company Ariscom, 1991-1992.
221 "Steam System from Steam Power Turbine at Kous", Sugar And Integrated Industries, 1991-1992.
222 "Evaluation Of Images Remote Sensing In Topographic Maps", National Project, 1991-1992.
223 "Study And Development Of Road Sector, Strategic Plan And Needs Assessment", For The Roads And Transportation Directorate Of North Sinai Governorate And Sponsored By USAID In Cairo, 1991 – 1992.
224 "Survey Of Light Rail Systems In Cairo And Alexandria", for The Transport Research Laboratory TRL, UK, 1991 – 1992
225 "Combustion Control System in Arabic Company" for Medical Glass, Cairo, 1991 – 1993.
226 "Study of Protection Of Roadways, Railways, And Airports From Sand Drifts And Flash Floods", for The Academy Of Scientific Research, 1991-1993.
227 "Study Of East Owienat Groundwater Reservoir, Phase II", For Cairo University. Egyptian/American University Link Project, 1991-1993.
228 "Trip Generation Model By Major Land Use Types In Greater Cairo", In Cooperation With The Transport Planning Authority For The Academy Of Scientific Research & Technology, 1991 – 1994.
229 "Supervising The Complete Rehabilitation Process Of Water Tube Boilers In Torah And Mustrod Sites", for Egyptian Starch And Glucose Company, 1991 – 1998.
230 "Investigating The Potentiality Of Using Combined Solar/Wind Generation System For Water Pumping In East Owient Area, Western Desert", for US. AID, 1992.
231 "Combustion System Tune-Up Programme", for EIPICO,10th Of Ramadan, 1992.
232 "Combustion System Tune-Up Programme", for GMC, 6th Of October, 1992.
233 "Combustion System Tune-Up Programme", for Hilton Ramsis Hotel, Cairo, 1992.
234 "Combustion System Tune-Up Programme", for Galaxo ABI Egypt., El-Salam City, 1992.
235 "Combustion System Tune-Up Programme", For Arab Aluminum Co., Ismailia, 1992.
236 "Combustion System Tune-Up Programme", For Star Glue, Alex, 1992).
237 "Greater Cairo Public Transport Fare Policy Study", For The Transport Planning Authority, 1992 – 1995.
238 "Feasibility Study And Analysis And Detailed Design Of A New Road Between Al Tur And Saint Catherine In South Sinai", For Research And Studies Organization, Ministry Of Development, 1992 – 1995.
239 "Implementation Of Waste-Heat Recovery System, Glass Melting Furnace At Orient Industrial Company", Manial Shiha, Giza, 1992-1997.
240 "Protection Of The Proposed Roadway Between EL-Tor And Saint Kathriene From Flash Floods", For The Ministry Of Housing And Development, 1993.
241 Combustion System Tune-Up Programme, For Cairo Beverages (7UP), 6th Of October, 1993.
242 Combustion System Tune-Up Programme, For Swiss Pharma, El Sawah, 1993.
243 "Combustion System Tune-Up Programme", For El Rashidy El Mizan Company, Sayeda Zainab, 1993.
244 "Combustion System Tune-Up Programme", For Arab Contractor Medical Center, Nasr City, 1993.
245 "Combustion System Tune-Up Programme", For National Company For Maize Product, 10th Of Ramadan, 1993.
246 "Combustion System Tune-Up Programme", For Giza For Textile, Tanash, Imbaba, 1993.
247 "Combustion System Tune-Up Programme", For Arab Pharmaceutical Glass Company, Attaka – Suez, 1993.
248 "Combustion System Tune-Up Programme", For National Beverages Company, Masroub, Qalioub, 1993.
249 "Combustion System Tune-Up Programme", For National Beverages Company, Tanta, 1993.
250 "Establishing Database On Energy Related Studies, Technical Reports And Research Works", For The Organization Of Energy Efficiency And Planning, 1993 – 1994.
251 "Upgrading of Computer Softwares To Develop The Activities Of The Organization of Energy Planning", 1993 – 1994.
252 "Energy Data Base In Industrial Sector In Arab Republic Of Egypt", 1993-1994.
253 "Evaluation of Air Pollutants At The Egyptian Aluminium Sulphate Company", 1993-1994.
254 "Power Factor Improvement at Techno Back Factory", 1993-1994.
255 "Rationalization of Energy In Industrial Processes At Sugar And Integrated Industries Company", 1993-1994.
256 "Rationalization of Energy Consumption in El Salam Hospital, 1993-1994.
257 "Study of Improvement 9 Boilers Efficiency and Rationalization of Fuel Consumption In Cairo Oil And Soap Company, 1993-1994.
258 "Technical Specifications for Industrial Wastewater Treatment Plants For Starch and Glucose Company", financed By Starch And Glucose Company, 1993-1994.
259 "Upgrading of The Management Of Implementation Of Projects In Sugar And Integrated Industries Company", 1993-1994.
260 "Consultation For Energy Equipment And Boilers For Starch And Glucose Company", financed By Starch And Glucose Company, 1993-1994.
261 "Design Of Equipments" for The Sugar And Integrated Industries Company, 1993-1994.
262 "Study Of Improvement Of Efficiency And Operation Of Furnaces And Rationalization Of Fuel Consumption In Cairo General Bakery Company", Greater Cairo General Bakery Company, 1993-1994.
263 "Analysis Of The Energy Consumption And Its Relation To The Productivity For Constructing Sector:, Financed By The Organization For Energy Planning, 1993-1994.
264 "Analysis Of The Energy Consumption And Its Relation To The Productivity For Spinning And Weaving Sector, And Industrial Engineering Sector", financed By The Organization For Energy Planning, 1993-1994.
265 "Rationalization Of Fuel And Oil Consumption In Heavy Equipment In The General Company For Land Reclamation", The Organization Of Energy Planning, 1993-1994.
266 "Development of a Center For Implementing Engineering Designs And Control And Measuring Systems, 1993-1994.
267 "Reducing Thermal Losses In Different Components Of The Egyptian Thermal Power Plants", for The Ministry Of Electricity And Energy, 1993 – 1994.
268 "Study Of Curing Water Leakage From The Lock At The End of Nubaria Canal", General Authority For River Transportation, 1993 – 1995.
269 "Losses Reduction in Thermal Power Station", 1993-1995.
270 "Submitting The Design And Supervising The Implementation Of Ash Catchers, Throughout The Different Sites, Attached To DIA Bagasse Boilers", For The Sugar And Integrated Industries Company, 1993 – 1997.
271 "Development Of Traffic Stream Relationships For Rural Roads In Egypt", For The Academy Of Scientific Research And Technology, 1993 – 1998.
272 "Energy Efficiency Improvement through Process Control, Cairo Beverage Company, 1993 – 1998.
273 "Implementation Of Three Large Energy Efficiency Demonstration Projects, Waste-Heat Recovery System At Elrasheedy Elmizan (Sweet Factory At 6 Oct. City), A 15 Ton/Day Glass Melting Furnace At Orient Industrial Company, Manial Shiha, Giza, And A Carbon Dioxide Recovery System At Cairo Beverages And Industries, Nasr City, Cairo, 1993-1998.
274 "Investigation Of The Impact Of Elevated Roads And Flyovers On Traffic In Greater Cairo", For The Academy Of Scientific Research And Technology, 1993 – 2000.
275 "Cogeneration Project Applied For Different Industrial Sectors In Egypt, Organization For Energy Planning, OEP 1994.
276 "Performance and Utilization of Boilers in Egyptian Industries", financed By the Organization for Energy Planning, OEP, 1994.
277 "Combustion System Tune-Up Programme", for National Beverages Co. MISROB, Benyswaif, 1994.
278 "Combustion System Tune-Up Programme", For Salam Hospital, 1994.
279 "Combustion System Tune-Up Programme", For Bristol Mayers, 1994.
280 "Combustion System Tune-Up Programme", For El-Mansoura Espana Garments Co., 1994.
281 "Combustion System Tune-Up Programme", For Elephant Glue, 1994.
282 "Expected Impacts of Energy Saving In Egyptian Industrial Sectors", Organization For Energy Planning, 1994-1995.
283 "Treating of Water Leakage at Lock Km 101 at El Nubaria Canal and Supervision on Implementation", for Ministry of Transportation, 1994-1995.
284 "Establishing Transportation Data Base In Arabic Republic Of Egypt, Organization For Energy Planning", for Ministry Of Transportation, 1994-1995.
285 "Trip Generation", For Ministry Of Transportation, 1994 – 1995.
286 "Inter Comparison of Simulation Model For Irrigation And Salinity In Egypt And Argentina", Europe Union, 1994-1995.
287 "Irrigation System Development Project at New Land, Green House" Research Project at Desert Regions, 1994-1995.
288 "Development of a Center For Implementing Engineering Designs And Control And Measuring Systems, Sugar And Integrated Industries Company, 1994-1995.
289 "Study of The Industrial Wastewater Treatment Plants For Starch And Glucose Company", Financed By Starch And Glucose Company, 1994-1995.
290 "Study For Efficiency Improvement Of Bread Ovens And Rationalization Of Fuel Consumption Of General Company, For Cairo Bakeries, financed By General Company For Cairo Bakeries, 1994-1995.
291 "Study of Improvement of Boilers Efficiency and Rationalization of Fuel Consumption in Cairo Oil aAnd Soap Company, Cairo Oil And Soap Company, 1994-1995.
292 "Use Of Gas Turbine Exhaust In Water Desalination In Suez Gulf District", 1994-1995.
293 "Analysis of Energy Consumption Pattern and Its Relation with Productivity In Both Spinning And Weaving And Engineering Industries Sectors, Organization Engineering Planning, Ministry Of Petroleum, 1994-1995.
294 "Study And Analysis Of Energy Consumption Patterns And Its Relation With Productivity In Construction Sector", Energy Planning Organization, For Ministry of Petroleum, 1994-1995.
295 "Rationalization of Energy Consumption In El Salam Hospital", 1994-1995.
296 "Rationalization of Energy Consumption in Continuous Casting, for National Company for Metal Industries, 1994.1995.
297 "Data Base For Studies, Technical Reports And Researches Related To The Energy, financed By The Organization For Energy Planning, O.E.P, 1994.1995.
298 "Rationalization Of Fuel And Oil Consumption In Heavy Equipment In The General Company For Land Reclamation", The Organization Of Energy Planning, 1994-1995.
299 'Development Computer Programs To Suit The Activities of The Organization of Energy Planning", The Organization of Energy Planning, 1994-1995.
300 "Improving The Operation And Performance of Boilers Of Eastern Company, Eastern Company, 1994-1995.
301 "Study and Implementing Programme To Reduce Gas Pollutants In Aluminum Sulphate Company, 1994-1995.
302 "Study And Design Of A Model Solar Heater for Helwan Company for Metalic Equipment, or Helwan Company for Metalic Equipment, 1994-1995.
303 "Sharing In The Foundation Of Design And Manufacturing Unit For Low Voltage Control Panels In The Manufacturing Of Electronic Units Complex In Studies Related To Be The Construction Of A Complex For Design And Manufacturing Of Electronic Units, Electric Panels And Instruments Sugar And Integrated Industries Company, Sugar And Integrated Industries Company, 1994-1995.
304 "Sharing In the Foundation Of Design And Manufacturing Electronic Power Systems With Microprocessors As A Part of Manufacturing of Electric And Electronic Units", Sugar And Integrative Industries Company, 1994-1995.
305 "Studies of Design And Manufacturing Electronic Power Systems With Microprocessors As A Part of Manufacturing of Electric And Electronic Units", Sugar And Integrative Industries Company, 1994-1995..
306 'Supervising The Implementation of Developing Maintenance Department In National Company for Metal Industries", National Company For Metal Industries, 1994-1995.
307 "Cooperation Programme in The Field Of Mechanical Design, Projects Administration Department", Sugar And Integrated Industries Company, 1994-1995.
308 "The Foundation Of Design And Manufacturing Electronic Power Systems With Microprocessors As A Part Of Manufacturing Of Electric And Electronic Units", Sugar and Integrative Industries Company, 1994-1995.
309 "Effect Of Urban Traffic Management On Fuel Consumption And The Environment (Application On Two Major Corridors In Greater Cairo)", 1994 – 1996.
310 "Combustion System Tune-Up Programme", For Inco-Steel, Abou Rawash, 1995.
311 "Combustion System Tune-Up Programme", For Coca Cola Port Said, Port Said, 1995.
312 "Combustion System Tune-Up Programme", For Kazareen, 6th Of October, 1995.
313 "Combustion System Tune-Up Programme", For Egypack Co, Helwan, 1995.
314 "Combustion System Tune-Up Programme", For Luxor Hilton Hotel, Luxor, 1995.
315 "Combustion System Tune-Up Programme", For Pharco Co., Alexandria, 1995.
316 "Combustion System Tune-Up Programme", For Gelatine Pharmaceutical Products, Alexandria, 1995.
317 "Combustion System Tune-Up Programme", For El-Rashidi Elmizan, 6th Of October, (1995).
318 "Combustion System Tune-Up Programme", For Chipsy, Sakkara, 1995.
319 "Combustion System Tune-Up Programme", For Chipsy, 6th Of October, 1995.
320 "Combustion System Tune-Up Programme", for MIGOB, Suez, 1995.
321 "Combustion System Tune-Up Programme", For Nile Clothing Co, Imbaba, 1995.
322 "Combustion System Tune-Up Programme", For Nasr Bottling Co., Channel Area, 1995.
323 "Cooperation Protocol with Projects Administration Department, Sugar and Integrated Industries Company, 1995-1996.
324 'Consultation Services for Energy Equipment, for Eastern Company Financed By Eastern Company, 1995-1996.
325 "Study And Design Of A Model Solar Heater For Helwan Company, for Metalic Equipment, 1995-1996.
326 "Cooperation Protocols For Manufacturing Of Egyptian Balady Bread Production Furnaces Satisfying Health And Economic Requirements", Arab British Company for Dynamic Industries, 1995-1996.
327 "Specialized Technical Consultations", Egyptian Starch And Glucose Company, 1995-1996.
328 "Development Of Oil Burners", Aboukheir Company For Engineering Industries, 1995-1996.
329 "Study Of Using Computers In The Design Of Pouring And Feeding System For Carbon Steel Castings", Helwan Company For Foundries, 1995-1996.
330 "Cooperation Protocol To Perform Studies And Designs Related To Energy Environment", Installation And Industrial Services Company, 1995-1996.
331 "Energy Management System", Ramsis Hilton, 1995-1996.
332 "Combustion Control and Heat Regeneration In An Aluminum Melting Furnace", Arab Aluminum Comapany, 1995-1996.
333 "Combustion Control", For Orient Company for Glass, 1995-1996.
334 "Heat Regeneration In Electrical Generators", El Rasheedy – El Mezan Company, 1995-1996.
335 "Replacement of Oil Burners with Natural Gas Burners In 40 Of Private Bakeries", 1995-1996.
336 "Carbon Dioxide Regeneration, Cairo Company for Refreshments And Industries", 1995-1996.
337 "Several Studies In The Field of Power Factor Improvement and Technical Support for Different Companies", Different Companies, 1995-1996.
338 "Covering of 45 Gas Analyzers for Private Sector Companies For Control of The Performance of Boilers And Industrial Furnaces In Different Companies, 1995-1996.
339 "Applying Of Pollution Control Methodologies through Selection of Raw Materials in a Group of Companies", 1995-1996.
340 "Technical Support for a Drinking Water Purification Station Project Residential City, New Rally Phosphate Projects, Arab Organization for Industrialization, 1995-1996.
341 "Specialized Technical Consultations For China And Refractoriness Company, General Company For China And Refractoriness, 1995-1996.
342 "Database For Intercity Road Transport Policy Formulation", For SYSTRA, For The Transport Planning Authority (TPA), 1995-1997.
343 "Design And Supervising The Manufacturing Of A Large-Scale Bagasse Dryer", For The Sugar And Integrated Industries Company, 1995 – 1997.
344 "The Energy and Environment Studies Unit Introduced A Pioneer Design For Balady Bread Baking Oven", For The Greater Cairo Company for Bakeries, 1995-1998.
345 "Pollution Prevention Diagnostic Assessment Project At Kazareen Co"., 1995-1998.
346 "Pollution Prevention Diagnostic Assessment Project At Incosteel Co"., 1995-1998.
347 "Pollution Prevention Diagnostic Assessment Project At AAV Co.", 1995-1998.
348 "Pollution Prevention Diagnostic Assessment Project At BTM Co"., (1995-1998).
349 "Pollution Prevention Diagnostic Assessment Project At National Company For Maize Products", 1995-1998.
350 "Pollution Prevention Diagnostic Assessment Project At Elrashidi Elmizan Company, 1995-1998.
351 "Pollution Prevention Diagnostic Assessment Project At Philco Company", 1995-1998.
352 "Pollution Prevention Diagnostic Assessment Project At Cepack Company", 1995-1998.
353 "Pollution Prevention Diagnostic Assessment Project At Aracemco Company", 1995-1998.
354 "Pollution Prevention Diagnostic Assessment Project At Misr Foam Company", 1995-1998.
355 "Pollution Prevention Diagnostic Assessment Project At Alamrya Metal Company", 1995-1998.
356 "Pollution Prevention Diagnostic Assessment Project At MOHM Company", 1995-1998.
357 "Pollution Prevention Diagnostic Assessment Project At AAC Company", 1995-1998.
358 "Implementation Of Three Large Energy Efficiency Demonstration Projects, Waste-Heat Recovery System At Elrasheedy Elmizan (Sweet Factory At 6 Oct. City), A 15 Ton/Day Glass Melting Furnace At Orient Industrial Company, Manial Shiha, Giza, and a Carbon Dioxide Recovery System", at Cairo Beverages And Industries, Nasr City, Cairo, 1995-1998.
359 "Participation In Technical Specifications And Technical Support For The Implementation Of Three Pollution Prevention Demonstration Projects: A Steamer At BTM In Tenth Of Ramadan City, A Caustic Soda Recovery System At Arab Aluminum Company, Ismailia, And An Evaporator System For Recovery Of Heavy-Metal Salts", At Multi-M Group (Mohm Sector, At El Khanka, Qualubia), 1995-1998
360 "Modernization and Upgrading Of 19 Cigarette Packaging Lines (SASIB 3000)", 1996.
361 "Auditing Systems for Energy and Environment", 1996.
362 "Protection Of Taba Electric Transformation Station, Sinai, From Flash Floods", for Kolaly For Engineering Works, 1996.
363 "Combustion System Tune-Up Programme", for Tasty Foods, Tanash – Imbaba, 1996.
364 "Combustion System Tune-Up Programme", for Cranchy, 1996.
365 "Combustion System Tune-Up Programme", for Areen Co., 6th Of October, 1996.
366 "Combustion System Tune-Up Programme", for Cadbury Egypt Co., 10th of Ramadan, 1996.
367 "Combustion System Tune-Up Programme", For Arma Co., 10th Of Ramadan, 1996.
368 "Combustion System Tune-Up Programme", for Shamsy For Textiles Co., 10th Of Ramadan, 1996.
369 "Combustion System Tune-Up Programme", for Santamora Textiles Company 10 Ramadan City, 1996.
370 "Combustion System Tune-Up Programme", for Colour Dye Co., 10 Ramadan City, 1996.
371 ".Combustion System Tune-Up Programme", for Alhesn Co., 10 Ramadan City, 1996.
372 "Combustion System Tune-Up Programme", for Orient Glass, Manial Shiha, 1996.
373 "Combustion System Tune-Up Programme", for Nasr Bottling Co., Alex, 1996.
374 "Combustion System Tune-Up Programme", for Nasr Bottling Co., Asyout, 1996.
375 "Combustion System Tune-Up Programme", for Nasr Bottling Co., Aswan, 1996.
376 "Combustion System Tune-Up Programme", for Nasr Bottling Co., Zagazig, 1996.
377 "Combustion System Tune-Up Programme", or Nasr Bottling Co., Talkha - Mansoura, 1996.
378 "Projects Of Firelighters Change To Natural Gas In 10, Khorsheed St., Rod Alfarag,", 1996.
379 "Projects Of Firelighters Change To Natural Gas In 154, Ibn Alkoran St., Rod Alfarag", 1996.
380 "Projects Of Firelighters Change To Natural Gas In 15, Darwish Alnaggar St., Rod Alfarag,", 1996.
381 "Projects Of Firelighters Change To Natural Gas In 11, Alkhalil Ibrahim St., Almatbaa, Alharam,", 1996.
382 "Projects Of Firelighters Change To Natural Gas In 84, 6 Of October St., Alzohoor, Altalaba, Giza", 1996.
383 "Projects Of Firelighters Change To Natural Gas In 12, Omar Moharam St., Altalbia, Giza", 1996.
384 "Projects Of Firelighters Change To Natural Gas In 14, Abdel Samia Hadad, Talbia, Giza", 1996.
385 "Projects Of Firelighters Change To Natural Gas In 9 Ahmed Arafa St., Alsahe"l, 1996.
386 "Projects Of Firelighters Change To Natural Gas In 16, Eskandar Yawakim, Alsahel", 1996.
387 "Projects Of Firelighters Change To Natural Gas In 6, Alabd St., Rod Elfarag", 1996.
388 "Projects Of Firelighters Change To Natural Gas In 4, Hassan Zidan, Alsahel", 1996.
389 "Projects Of Firelighters Change To Natural Gas In 3, Marawan Mohamed St., Alsahel", 1996.
390 "Projects Of Firelighters Change To Natural Gas In 19, Altameer, Omrania Gharbia, Giza", 1996.
391 "Projects Of Firelighters Change To Natural Gas In 5, Mohamed Galal, Arab Gesr, Ain Shams", 1996.
392 "Projects Of Firelighters Change To Natural Gas In 191, Alteraa Alboulakia, Alsahel", 1996.
393 "Projects Of Firelighters Change To Natural Gas In 29, Mathaf Almatria St., Ain Shams", 1996.
394 "Projects Of Firelighters Change To Natural Gas In 10, Mubarak Alsayed St., Alkoom Alakhdar, Alharam", 1996.
395 "Projects Of Firelighters Change To Natural Gas In 21, Soliman Alabd St., Alsahel", 1996.
396 "Projects Of Firelighters Change To Natural Gas In 19, Mostafa Shareb St., Alsahel", 1996.
397 "Projects Of Firelighters Change To Natural Gas In 29, Alsalam St., Ain Shams", 1996.
398 "Projects Of Firelighters Change To Natural Gas In 9, Michel Wahba St., Alsahel", 1996.
399 "Projects Of Firelighters Change To Natural Gas In 21, Abdel Khalek Wasfi St., Alsahel", 1996.
400 "Projects Of Firelighters Change To Natural Gas In 21, Beny Helal St., Kitkat", 1996.
401 "Projects Of Firelighters Change To Natural Gas In 11, Amin Alden St., Rod Elfarag", 1996.
402 "Projects Of Firelighters Change To Natural Gas In 122, 9 St., Almaadi", 1996.
403 "Projects Of Firelighters Change To Natural Gas In 76, Mostafa Fahmy St., Helwan", 1996.
404 "Projects Of Firelighters Change To Natural Gas In 13 Wabour Alteheen St., Rod Elfarag", 1996.
405 "Projects Of Firelighters Change To Natural Gas In 32, Alberens Dawood St., Rod Elfarag", 1996.
406 "Projects Of Firelighters Change To Natural Gas In 5, Abdel Fatah Algamal St., Alsahel", 1996.
407 "Projects Of Firelighters Change To Natural Gas In Behind Ain Shams Police Station", 1996.
408 "Projects Of Firelighters Change To Natural Gas In 3, Altatweer St., Omrania, Giza", 1996.
409 "Projects Of Firelighters Change To Natural Gas In 3, Hermina St., Alsahel", 1996.
410 "Projects Of Firelighters Change To Natural Gas In 10, Dayer Alnahia St., Giza, 1996.
411 "Projects Of Firelighters Change To Natural Gas In 19, Bahr Ahmar St., Behind Sayed Darwish, Giza", 1996.
412 "Projects Of Firelighters Change To Natural Gas In 22, Mohamed Ibrahim St., Meet-Okba", 1996.
413 "Projects Of Firelighters Change To Natural Gas In 4, Ahmed Shawki St., Kitkat, Imbaba", 1996.
414 "Projects Of Firelighters Change To Natural Gas In 128, 9 St., Al-Maadi", 1996.
415 "Projects Of Firelighters Change To Natural Gas In 14, Mahmoud Shalaby St., Alsahel", 1996.
416 "Projects Of Firelighters Change To Natural Gas In 4, Alkahteeb St., Gesr Alsuez, Alzytoon", 1996.
417 "Environmental Impact Assessment Projects For GOSCO And ACR Petroleum Companies", 1996-1997.
418 "Studies and Measurements On Electrical Cables For Different Companies, Elsewedy, South Delta, South Upper Egypt … Etc, 1996-1997.
419 "Rehabilitation of 36 Packaging Units, Eastern Company", 1996-1997.
420 "Manufacturing Of Model Spare Parts, Eastern Company", 1996-1997.
421 "Sharing In Preparing Of Basic Engineering And Follow Up of Installing Computerized Control And Measurement System For Industrial Proces"s, Sugar And Integrated Industries Company, 1996-1997.
422 "Study Of The Design Of 1200mm Water Pipeline From El Tebeen Station To 15 May City, Research And Studies Department", Ministry Of Housing And Urban Societies, 1996-1997.
423 "Cooperation with Project Management Department", Sugar And Integrated Industries Company, 1996-1997.
424 "Demand-Side Management Audits", In Alexandria: Helnan Palestine Hotel, 1996-1997.
425 "Demand-Side Management Audits", In Amerya For Metals Co., 1996-1997.
426 "Demand-Side Management Audits", In ANSDK, 1996-1997.
427 "Demand-Side Management Audits", In Alexandria Beverages And Industries, 1996-1997.
428 "Demand-Side Management Audits", in LECICO, 1996-1997.
429 "Demand-Side Management Audits", In RUBEX, 1996-1997.
430 "Design And Studding The Requirements For Widening The Highway Connecting Nabkk And Sharm El-Sheikh", For General Authority For Tourism Development, 1996 – 1997.
431 "Flash Flood Consultation For Badr City – Newly Constructional Society Organization, 1996-1997.
432 "Improvement Of Steam Systems In Some Private Sector-Companies", 1996-1998.
433 "Steam System Improvement Project At Liver Egypt Co. In 10th Of Ramadan City", 1996-1998.
434 "Steam System Improvement Project At Chipsy Co. In 6th Of October City", 1996-1998.
435 "Steam System Improvement Project At Alhesn For Textile In 10th Of Ramadan City", 1996-1998.
436 "Pollution Prevention Diagnostic Assessment Project", at Fakhoury Tex Co., 1996-1998.
437 "Pollution Prevention Diagnostic Assessment Project, atGolden Tex Co", 1996-1998.
438 "Pollution Prevention Diagnostic Assessment Project At Alhesn Co. , (1996-1998).
439 Pollution Prevention Diagnostic Assessment Project At Olympic Co. , (1996-1998).
440 Pollution Prevention Diagnostic Assessment Project At Kiriazy Co. , (1996-1998).
441 Pollution Prevention Diagnostic Assessment Project At Technogas Co. , (1996-1998).
442 Pollution Prevention Diagnostic Assessment Project At PPP Co. , (1996-1998).
443 Pollution Prevention Diagnostic Assessment Project At ELF Co. , (1996-1998).
444 Pollution Prevention Diagnostic Assessment Project At Egyptian-Germany For Cardboard Co. , (1996-1998).
445 Pollution Prevention Diagnostic Assessment Project At EIPICO Co. , (1996-1998).
446 Pollution Prevention Diagnostic Assessment Project At Alahram For Metal Co. , (1996-1998).
447 Pollution Prevention Diagnostic Assessment Project At ABB Arab Co. , (1996-1998).
448 Pollution Prevention Diagnostic Assessment Project At SIAG Co., (1996-1998).
449 Pollution Prevention Diagnostic Assessment Project At Link Misr Co. , (1996-1998).
450 Pollution Prevention Diagnostic Assessment Project At Fresh 1 Co. , (1996-1998).
451 Pollution Prevention Diagnostic Assessment Project At Fresh 2 Co. , (1996-1998).
452 Pollution Prevention Diagnostic Assessment Project At Alchourbagy Co. , (1996-1998).
453 Pollution Prevention Diagnostic Assessment Project At Shatex Co. , (1996-1998).
454 Pollution Prevention Diagnostic Assessment Project At Dayem Tex Co. , (1996-1998).
455 Pollution Prevention Diagnostic Assessment Project At Egyptian American For Painting Co., (1996-1998).
456 "Ongoing Consultation Activities Covering Steam Boilers, Steam And Condensate Networks, Compressed Air Systems, Pressure Vessels, And Other Mechanical Equipment" For The Eastern Company, 1996 – Present.
457 "Evaluating the Different Technologies To Minimize The Effects Of Global Warming", 1997.
458 "Intercomparaison Of Simulation Models In Argentina And Egypt For DLO Wilnand Staring Center For Integrated Land, Soil And Water Research, (SC-DLO), 1997.
459 "Combustion System Tune-Up Programme", For MEG, Nasr City, 1997.
460 Combustion System Tune-Up Programme, For SHELL Co., 6th Of October, (1997).
461 Combustion System Tune-Up Programme, For Hurgada Marriott Hotel, Hurgada, (1997).
462 Combustion System Tune-Up Programme, For Egyptian International For Pharmaceutical Industries, 10th Of Ramadan, (1997).
463 Combustion System Tune-Up Programme, For Semiramais Intercontenental Hotel, Cairo, (1997).
464 Combustion System Tune-Up Programme, For Nestle Egypt, 6th Of October (1997).
465 Combustion System Tune-Up Programme, For Novartis, Alameyria-Cairo (1997).
466 Combustion System Tune-Up Programme, For Liver Egypt, 10th Of Ramadan (1997).
467 Combustion System Tune-Up Programme, For Ismailia Slaughter House Co., Ismailia, (1997).
468 Combustion System Tune-Up Programme, For Savola Egypt, 10th Of Ramadan (1997).
469 Combustion System Tune-Up Programme, For Sonesta Sharm El Sheikh Hotel, (1997).
470 Combustion System Tune-Up Programme, For Golden Tex, 10th Of Ramadan (1997).
471 A Study Of Reducing Gas And Particulates Pollutants In The Aluminium Sulphate Company Of Egypt, Financed By Aluminium Sulphate Company, (1997-1998).
472 "Reducing Thermal Losses In Different Components Of The Egyptian Thermal Power Plants", For The Academy Of Scientific Research And Technology, (1997 – 1998).
473 Design And Implementation Studies For Water Feeding And Drainage Network For Sewa City, Ministry Of Housing, (1997-1998).
474 Drainage Services, Lower Mokattam Plateau, Arab Contractors, Helwan, (1997-1998).
475 Rehabilitation of Packing Machines, For Eastern Company, (1997-1998).
476 Cooperation With Eastern Company In Manufacturing Model Spare Parts, Eastern Company, (1997-1998).
477 Testing Of Samples Of Plastic Pipes Arab Contractors, Industrial Projects Company And Other Companies, 1997-1998.
478 Studies On Low Voltage Insulators And Cables And Connections For Some Electricity Distribution Companies, 1997-1998.
479 Replacement Of Oil Products With Natural Gas, Helwan Company For Engineering Industries, 1997-1998.
480 Design Of Oxygen Pumping System, National Institute For Cancer, 1997-1998.
481 Treatment Of Industrial Waste Water National Company For Corn Products, 10th Of Ramadan City, 1997-1998.
482 Detailed Study Of Medical Gas Network In The National Institute For Cancer, 1997-1998.
483 Design and Fabrication Of Natural Gas Feeding Network For Furnaces In Maady For Engineering Industries, 1997-1998.
484 "Specialized Technical Consultations For China And Refractoriness Company, General Company For China And Refractoriness, 1997-1998.
485 "Specialized Technical Consultations For Eastern Company, 1997-1998.
486 "Specialized Technical Consultations For Egyptian Starch And Glucose Company, 1997-1998.
487 "Cooperation with Projects Department", Sugar And Integrated Industries Company, 1997-1998.
488 "Improvement of Industrial Drainage in Egyptian Company for Starch and Glucose", Egyptian Company for Starch and Glucose,1997-1998.
489 "Pollution Control In Brick Factories", EEAA, 1997-1998.
490 "Feeding The Database For Intercity Road Transport Policy Formulation", For The Transport Planning Authority (TPA), 1997 – 2000
491 "Selection And Supervision Of The Erection Of The Industrial Wastewater Biological Plants In The Abovementioned Sites", For Egyptian Starch And Glucose Company, 1997 – 2001
492 Rehabilitation Of Industruial Orient Company To Achieve Iso14001, 1998.
493 Energy Audit For Two Of The Ghabbour Group Plants, 1998
494 Rehabilitation Of Arab Aluminium Company To Achieve Iso14001, 1998
495 Combustion System Tune-Up Programme, For Helnan Palestine Hotel., Alex, 1998.
496 Combustion System Tune-Up Programme, For ELF Co., 10th Of Ramadan, 1998.
497 Combustion System Tune-Up Programme, For Integrated Oil Industries Co., Cairo, 1998.
498 Consultations Services In Preparing The Compliance Action Plans According To The Environmental Law No. 4 / 1994 For Four Industrial Plants In Egypt, Including El Nasr Automotive Company (NASCO) (Funded By FINNIDA), Tasty Foods Egypt, Elrasheedy Elmizan (Sixth Of October City), TEPCO (Sixth Of October City), And El Sabaa Glue Factory, Cairo, 1998-1999
499 Project: "Analysis Of Energy Consumption Patterns And Environmental Indicators In The Commercial Sector In Egypt", Organization For Energy Planning, 1998-1999
500 Study Of The Combustion System Developments For Brick Factories In Egypt. Financed By Cabinet Of Ministers, Egyptian Environmental Affairs Agency, Industrial Compliance Unit, 1998-1999.
501 National Project For Boiler Efficiency Improvement financed By The Organization For Energy Planning (OEP), 1998-1999.
502 Testing Of Metal And Plastic Samples For Eabd Contractors, Arab Contractors, National Plastic Company, Elbehyra Contractors, 1998-1999.
503 Manufacturing And Supply Of The Components Of Operation And Control System Of Packing Line Model SASIB 6000- CPI, Eastern Company, 1998-1999.
504 Testing Of Electric Cables And Aluminum Conductors, El Swedy Company, South Delta Electricity Authority, Canal Electricity, 1998-1999.
505 Protection Of Private Beach Of The Summer Resort Of The Employees Of Arab Contractors Company, 1998-1999.
506 Study Of The Project Of The Manufacture Complex In Sharm El-Sheikh, Social Fund For Development (SFD), 1998-1999.
507 Drainage Network In Kalag Village, Industrial And Engineering Projects Company, 1998-1999.
508 Studies And Designs For Public Services Networks For Housing Units In Ain Helwan Housing Bank, Ministry Of Housing, 1998-1999.
509 Design And Erection Studies For Water Feeding And Drainage Networks For Sewa Oasis, Ministry Of Housing, 1998-1999.
510 "Development Of Ash Separators, Sugar And Integrated Industries Company", 1998-1999.
511 "Studies To Overcome The Energy And Environmental Problems In Clay Brick Factors", Egyptian Enviromental Affairs Authority, (EEAA), 1998-1999.
512 "Enviromental Studies For Nasr Engineering And Cooling Company, (Koldaire), 1998-1999.
513 "Supervising Air Conditioning Installation In Eastern Company Factories", Eastern Company, 1998-1999.
514 "Pollution Measurements In Scientific Center", El Giza Cable And Santamora For Blankets, 1998-1999.
515 "Pollution Assessment In China And Refractoriness Factories", General Company For China And Refractory Products, 1998-1999.
516 "Design, Fabricating And Programming Of 27 Operation And Control Cabinet Using PLC For Packaging Cigarette Line", 1998-1999.
517 "Greater Cairo Public Transport Study & General Features Of The GC Metro 3rd Line", DRTPC-TP For SYSTRA For The National Authority For Tunnels And The Egyptian Ministry Of Transport, 1998 – 2000.
518 "Production Of The Unified Information Bulletin On All Sectors Of The Ministry Of Transport And Communications", For The Transport Planning Authority (TPA) And The Egyptian Ministry Of Transport, 1998 – 2001
519 Improving Of Utilization Technologies Of Rain And West North Coast And North Sinai, Academy Of Scientific Research And Technology, 1998 – 2002.
520 "Local Authorities Institutional Development For Transport &Traffic Planning & Engineering Professional Posts", For The Academy Of Science Research & Technology, 1998 – 2003
521 Studies Of Different Technique Of Flash Flood And Rains Fall Harvesting, Scientific Research At Halayeb And Shalateen, Scientific Research Academy, 1998-2004.
522 "Upgrading The Fuel And Combustion Systems In Clay And Thermal Brick Factories", A Study Financed By The Egyptian Environmental Affairs Agency EEAA, Industrial Compliance Unit, 1998- 2006.
523 "Tune-Up Of Combustion Systems And Boilers At Several Companies", 1998 - Now.
524 "Planning And Preventive Maintenance For Glass Melting Furnace In Orient Glass Company", 1999.
525 "Evaluating The Energy Consuming Appliances Market, ECEP", 1999.
526 "Consultations Services On Ventilation System Redesign For Ghabbour Company, 1999.
527 "Evaluation Of Workers Performance In Coca Cola Egypt", 1999-2000.
528 "The Modification Of The Article 42 (C), Of The Executive Statutes (338/1995) Of The Egyptian Law On Environment (Law 4/1994), Regarding The Emissions From Boilers, Clay Brick Kilns, And Thermal Brick Kilns", For The Egyptian Environmental Affairs Agency EEAA, 1999-2000.
529 Design Of Boiler Ash Catcher For Egyptian Sugar And Distillation Company. Financed By Egyptian Sugar And Distillation Company, 1999-2000.
530 Study Of Protection Of Othmason Beach In AL-Arish From Scour, Othman Ahmed Othman Company, 1999 – 2000.
531 Measurements On Cables And Conductors, El Sweedy Company, South Delata Electricity, Canal Electricity, 1999-2000.
532 Operation And Control Panels For Smoke Leaves Dryers, For Eastern Company, 1999-2000.
533 Test And Measurements On Raw Materials, For Arab Contractors And El Beheira Company, 1999-2000.
534 Design And Manufacturing Of Model Spare Parts, For Eastern Company, 1999-2000.
535 Drainage Project, Helwan, Arab Contractors, 1999-2000.
536 Study Of Communication Services Needed For Construction Sector And Methods Of Implementation, For El-Nile Company For Information And Communication, 1999-2000.
537 Extra Works For The Information Network Project For The Transportation Sector, For The Transportation Planning Authority, Ministry Of Transport, 1999-2000.
538 Preparation Of The Terms Of Reference For The Information Network Of The General Authority For Ports", For The General Authority For Ports, 1999-2000.
539 Environmental Studies And Measurements For A Group Of Companies And Factories, 1999-2000.
540 "Preparation Of Terms Of Reference And Technical Specifications Evaluation And Selections Of Proposals For Industrial Waste Water Station At Mostorod", Egyptian Company For Starch And Glucose, 1999-2000.
541 "Preparation Of Operation Guide For Clay Brick Factories", For Kemonis Company, Canadian Aid, 1999-2000.
542 "Contract For Conversion Of Equipment And Furnaces To Work With Natural Gas Instead Of Liquid Fuels", For El- Maasara Company For Engineering Industries, 1999-2000.
543 "Enviromental Measurements, Preparation Of Enviromental Register And Study Of The Effect Of Additives On The Performance Of Combustion Systems", For Misr Otsoka Company, Ekia Company, And Arab Aluminium Company, 1999-2000.
544 "Combustion Emission Measurements", Ein El Sabie Factory, Santamora For Blankets, 1999-2000.
545 "Medical Waste Treatment Unit", For National Institute For Cancer, 1999-2000.
546 "Evaluation of Assets And Study Of Refrigeration Alternatives", El Boohy Company, Nile Hotel, 1999-2000.
547 "Study Of The Influence Of Privatization On Energy Efficiency Policies In Industrial Companies", Under Contract From The Organization For Energy Planning, 1999-2001.
548 "National Project For Augmenting The Positive Impacts Of The South Valley "Toshka", Financed By American Ministry Of Agriculture Through Ministry Of International Cooperation, 1999-2001
549 “Energy Survey And Environmental Indicators In The Residential Sector In Greater Cairo", Under Contract From The Energy Efficiency Improvement And Greenhouse Gas Reduction Project (GEF/UNDP), 1999-2003.
550 "Participation In The Design Modifications For Bag Filters At Eastern Company", 2000.
551 "Design And Supervising The Implementation Of Two Metallic Towers For Advertising", Akhbar El Youm, 2000-2001.
552 Design of Model Spare Parts, For Eastern Company, 2000-2001.
553 "Testing And Measurement Raw Materials Arab Contractors", For El Beheira Company, 2000-2001.
554 "Preparation Technical Specifications And Terms Of Reference For The Construction Of Sanitory Waste Water Treatment Station At Mostorod Factory", Egyptian Company Of Starch And Glucose, 2000-2001.
555 "Evaluation Of Pollution From China And Refractories Furnaces (Second And Third Stages)", General Company For China And Refractories, 2000-2001.
556 "Technical Specifications For Industrial Wastewater Treatment Plants", For Starch And Glucose Company. Financed By Starch And Glucose Company, 2000-2001.
557 "Conversion For Natural Gas Feeding Network Of Furnaces And Equipments In Maady" For Engineering Industries, 2000-2001.
558 "Emission Reduction From Printing Machine In Rose El Yousif Foundation", (2000-2001).
559 "Consultation Services In The Field Of Communications, El Nile Communication Company", Engineering Consultations Company And Gasco Company, 2000-2001.
560 "Use Of GIS The Analysis Of The Effect Of Drainage Station On The Properties Of Water, The Natural Project For Providing Water And Improve Its Quality", Ministry Of Irrigation, 2000-2001.
561 "Greater Cairo Drainage Project, 15 May City", Arab Contractors, 2000-2001.
562 "Testing Of Electric Cables And Conductors", El Sewedy Company, South Delta Company And Canal Electricity Company, 2000-2001.
563 "Studies And Consultations In The Field Of Air Conditioning", EEAA, 2000-2001.
564 "Design Of Modification And Rehabilitation Work In Central Air Conditioning System", Sofitel Winter Palace Hotel, Luxor, 2000-2001.
565 "Design Of A Traffic Management Scheme For The Cairo University And Zoological Park District, Giza", For Cairo University (DRTPC) & Giza Governorate, 2000 – 2001.
566 "Evaluating The Different Technologies To Minimize The Effects Of Global Warming", Financed By EEAA And UNDP, 2000-2003.
567 'Design And Supervision Of Implementation Of A Sanitary Landfill In Tanta, Gharbia Governorate", 2000-2006.
568 Project: “Design And Supervision Of Implementation Of A Sanitary Landfill For Incinerated Garbage In Kafr Hashad”, Gharbia Governorate, 2000-2006.
569 "Ten Extensive Transport Demand And Supply Surveys And Building The Networks For Roads And Public Transport Modes In Greater Cairo For The "Study On Transportation Master Plan And Feasibility Study Of Urban Transport Projects In Greater Cairo In The Arab Republic Of Egypt", Contract Carried Out For Pacific Consultants International (PCI), Japan And The Egyptian Ministry Of Transport, 2001.
570 "Design And Implementation Of A Technical Management Support System For Packaging Lines (LAN)", 2001.
571 "Design And Fabrication Of 3 Bag Filters For Tobacco Dust Collection", 2001.
572 "Rehabilitation And Upgrading Of 7 Packaging Lines For Cigarette Packs And Design And Implementation Of Their Industrial Control Systems (PLC Based)", 2001-2002.
573 "Techno-Economical Feasibility Study On The Investigation To The Different Alternatives For Exporting Egyptian Natural Gas" For The Organization Of Energy Efficiency And Planning, 2001 – 2002.
574 "Design And Supervising On Implementing Of A Central Air-Conditioning Unit" In Cooperation With Sahara Company, 2001 – 2002.
575 "Consultations In The Field Of Air Conditioning", EEAA, 2001-2002.
576 "Preparation Of Specifications For Normal Work And Electricity Generation System From Solar Energy", EEAA, Cairo And Fayoum Branches, 2001-2002.
577 "Testing And Measurements On Electrical Cables For Different Companies", Elsewedy, South Delta, Canal Electricity … Etc, 2001-2002.
578 "Development Of Water Types Standards And Using GIS To Develop An Atlas With Cooperation Canadian PID", Ministry Of Irrigation, 2001-2002.
579 "Primary Studies, Final Designs, Executive Drawings, And Periodical Supervision On Implementation Of Rainwater Drainage In Greater Cairo", Ministry Of Housing And New Communities, 2001-2002.
580 "Detailed Executive Studies For Rehabilitation Of Water Network In Qantarah Shark, Ismailia Governorate", Ministry Of Housing And New Communities, 2001-2002.
581 "Technical Consultation For Boilers For Eastern Company", Financed By Eastern Company, 2001-2002.
582 "Environmental Measurements At Several Companies", 2001-2002.
583 "Environmental Register And Environmental Measurements For Shini Ceramic And Production Company", Financed By Shini Company, 2001-2002.
584 "Design And Manufacturing Minced Smoke Feed Unit Project With All Its Accessories And Operation And Automatic Control System Talbia Factory, Eastern Company, 2001-2002.
585 "Design And Manufacturing Of Model Ideal Spare Parts, For Eastern Company", 2001-2002.
586 "Upgrading The Charcoal Kilns To Be Able To Comply With The Environmental Emission Levels. A Demonstration Project In El-Gharbeyia Governorate Was Implemented" For The Egyptian Environmental Affairs Agency EEAA, 2001 – 2002.
587 "Design Of The Information Network Of The General Authority For Land Ports", For The General Authority For Land Ports, 2001 – 2003.
588 "A Number Of Projects Of HVAC Systems In Different Company Sites, Including The Use Of The Absorption Refrigeration Technology" For The Eastern Company, 2001 – Present.
589 "Design And Manufacturing Of 7 Packaging Lines For Cigarette Packs Including Their PLC Based Industrial Control System", 2002.
590 "Rehabilitation Of 9 Cigarette Packaging Lines (SASIB 3000/4000) And Preparing Them For Export", 2002.
591 "Design And Implementation Of PLC Industrial Control Systems For Tobacco Silos And Blending Systems For Factories 1, 2 & 3 I For The Eastern Company in Giza", 2002.
592 "Initial Design And Feasibility Study Of The Underground Garage Located In Nahdat Misr Street In Front Of Cairo University, With An Appropriate Capacity Of 500-600 Cars", For Cairo University (DRTPC) & Giza Governorate, 2002-2003.
593 "Design Of An Automatic Up-To-Date Liquid-Fuel Combustion System For The Molasses Facilities Replacing The Primitive Solid-Fuel One", For The Egyptian Environmental Affairs Agency EEAA, 2002 – 2003.
594 "Report On The Construction Of Port-Said National Bank For Development, Mansoura Branch, 2002 – 2003.
595 "Study Of The Industrial Wastewater Treatment Plants For National Company Of Maize Products (NCMP)", Financed By NCMP, 2002 – 2003.
596 "Supervising The Extension Of The National Institute For Communications", 2002-2003.
597 "Development Technical Secondary Schools, Electronics And Computers Training", Ministry Of Education, 2002-2003.
598 "Technical, Managerial And Economical Consultations" For The Egyptian Electricity Utility And Consumer Protection Regulatory Agency, The Egyptian Electricity Utility And Consumer Protection Regulatory Agency, 2002-2003.
599 "Updating And Development Minced Smoke Feed Unit Project With All Its Accessories And Operation And Automatic Control System Talbia Factory", Eastern Company, (2002-2003).
600 "Design, Fabrication And Installation Of 2 Cigarette Makers Feeding Units (Including Airlock, Conveyor Belts, Suction Line And PLC Control System)", Eastern Company, (2002-2003).
601 "Design And Manufacturing Of Model Ideal Mechanical Spare Parts", Eastern Company, 2002-2003.
602 "Environmental Measurements And Environmental Register For The Red Sea Sustainable Tourism Initiative (RSSTI), Tourism Development Authority (TDA), 2002-2003.
603 "Evaluation Of Pollution From China And Refractories Furnaces, General Company", For China And Refractories, 2002-2003.
604 "Field Technical Studies For Liquid Drainage Waste In Eastern Company Factory", Eastern Company, 2002-2003.
605 "Comprehensive Technical Auditing Of Boiler And Steam Systems", Eastern Company, 2002-2003.
606 "Design And Elaboration Of A Solid Waste Incinerator" For The Egyptian Company For Matches, He Egyptian Company For Matches, 10th Of Ramadan City, 2002-2003.
607 "Environmental Measurements For Energy Rationalization And Environmental Protection At Several Companies", 2002-2003.
608 "Primary Studies, Final Designs, Executive Drawings, And Periodical Supervision On Implementation Of Rainwater Drainage In Greater Cairo", Ministry Of Housing And New Communities, 2002-2003.
609 "Rehabilitation Of Water Network In Qantarah Shark, Ismailia Governorate", Researches And Studies System, Ministry Of Housing And New Communities, 2002-2003.
610 "Design Of A Sanitary Wastewater Treatment Plant, For "Zankalon City", Sharquia Governorate, 2002-2003.
611 "Studies For Electricity Company, Different Companies", 2002-2003.
612 "International Search For Transportation Network Across Europe And Mediterranean", European Union, 2002-2003.
613 Specifications Of Power Supply Using Solar Energy For EEAA, Greater Cairo And Fayoum Branch, 2002-2003.
614 Evaluation And Commissioning Committee For Fire Alarm System Misr Company For Cinema Production And Distribution And Preparation Of Technical Specifications For Air Conditioning Systems In Other Companies And Misr Cinema, 2002-2003.
615 Consultation Services In The Field Of Mechanical Engineering Including Studies, Auditing, Design For Engineering Consultants Group, 2002-2003.
616 Auditing Central Air Conditioning System In NOC Communication Center, 2002-2003.
617 Solar Energy Systems In Wadi El Rayan Protected Area, Fayoum, EEAA, 2002-2003.
618 Auditing Of Electrical And Other Services Works, EEAA Building, Tamooh, EEAA, 2002-2003.
619 Rehabilitation And Replacement Work In Central Conditioning System, Miricor Etab Hotel, Luxor, 2002-2003.
620 Engineering Consultation In Mecca Tunnels, Kemonics Consultation Office, 2002-2003.
621 "Initial Design And Feasibility Study Of The Underground Garage Located In Nahdat Misr Street In Front Of Cairo University, With An Appropriate Capacity Of 500-600 Cars", For Cairo University (DRTPC) & Giza Governorate, (2002-2003)
622 "Safety Of Public Transport Users On Highways", For The Transport Planning Authority (TPA) And The Egyptian Ministry Of Transport, (2002-2003)
623 Traffic Surveys On Major Arterials And At Major Road Intersections In Greater Cairo For The "Study On Transportation Master Plan And Feasibility Study Of Urban Transport Projects In Greater Cairo Region In The Arab Republic Of Egypt, Phase II – Feasibility Study. Service Contract For Traffic Count Survey" Carried Out For Pacific Consultants International (PCI), Japan And The Egyptian Ministry Of Transport, (2002-2003)
624 Environmental Measurements And Environmental Register For Different Companies And Factories, (2002-Now).
625 "Modernization Of The Industrial Control Systems Of 5 Auto-Feed Conveyor Systems For Drying Tanks", 2003
626 "Rehabilitation And Modernization Of Tobacco Silos And Tobacco Blending Systems In Talebeya Factory (Silos, Conveyor And Weighting Belts, Control Systems, SCADA System)", 2003.
627 "Rehabilitation Of Weighting Belts For Blending Systems (Factory No 2)", 2003.
628 "Manufacturing Of Special Carrage For Tobbaco Loading", 2003.
629 "Design, Fabrication And Installation Of Equipment For Blending Systems In Tobacco Processing And Feeding Sections (Conveyor Belts, Weighting Belts, Metering Tubes, Filters, Airlocks, Control Cabinets, SCADA, Host Computer, Etc)", 2003
630 "Design and implementation of a Class 5 Switch on an Intel based platform", for Quicktel (Egypt), 2003–2004.
631 Modernization Of Blending Balance Belts In Smoke Preparation Factory No (3) And Talbia, Eastern Company, 2003-2004.
632 "Upgrading The Combustion System Of Hand-Made Pottery Kilns", For The Egyptian Environmental Affairs Agency EEAA, (2003 – 2004)
633 Consultation Services In The Field Of Mechanical Engineering, For Engineering Consultants Group, 2003-2004.
634 Development Of Air Conditioning And Ventilation System For American University Theater In Maadi, Byser Consultants, 2003-2004.
635 Environmental Measurements, Preparation Of Environmental Register And Compliance Action Plans For Different Factories And Companies, 2003-2004.
636 Field Technical Studies For Liquid Drainage Waste In Eastern Company Factory, Eastern Company, 2003-2004.
637 Comprehensive Technical Auditing Of Boiler And Steam Systems, Eastern Company, 2003-2004.
638 Environmental Register And Environmental Measurements For Eastern Company, Financed By Eastern Company, 2003-2004.
639 Evaluation Of Pollution From China And Refractories Furnaces (Second And Third Stages), General Company For China And Refractories, 2003-2004.
640 Testing Of Natural Gas Filling Values In Natural Gas Tanks, Car Gas, 2003-2004.
641 Replacement Of Operation And Electrical Control System For Auto Feed Belts And Rehabilitation Of Balance Belts For Smoke Blending, Eastern Company, 2003-2004.
642 Design Of Model Spare Parts, Eastern Company, 2003-2004.
643 Development Technical Secondary Schools, Second Stage, Ministry Of Education, 2003-2004.
644 Economical Barriers For Uses Circuits In Ground Network, Scientific Research Academy, 2003-2004.
645 Preparation Of Design Study For Water Feeding Network, Sywa Oasis, Ministry Of Housing And Urban Societies, 2003-2004.
646 Building Of Drainage Network In El Khosos Village, Kalubia Governorate, Elnasr Contracting Company, 2003-2004.
647 Development And Rehabilitation Of Internal Electrical Network In Sofitel Hotel, Alex. Acore Hotel Companies, 2003-2004.
648 Studies For Electrical Companies, For Different Companies, 2003-2004.
649 "Azhar Underground Parking Garage Traffic Studies And Design Services", In Old Cairo Touristic Area, For Aga-Khan Cultural Services, Egypt (AKCS-E), 2003- 2004.
650 Activation Sharing In Water Resources Management Beni Sweef Governorate, 2003-2004.
651 Design Of Control Protocol Of User Entry In Urban Wireless Communication Network, Net Clair Company, WILAN Company, 2003-2004.
652 "Mediterranean And Trans-European Networks For Transport, MEDA TEN-T", For The European Commission, (2003-2005)
653 "Redesign Of The Highways Sections Practicing Black Spots Of High Accidents Rates On The National Highways Network", For The General Authority For Roads, Bridges And Land Transport, (GARBLT), For The Ministry Of Transport, Egypt, (2003 – 2005)
654 "Feasibility Of The Location Of Three Bridges On The River Nile", For The General Authority For Roads, Bridges And Land Transport”, (GARBLT), For The Ministry Of Transport, Egypt, (2003-2005)
655 "Study of Financing and Management of Transport Infrastructure Projects", For The Academy of Science Research & Technology, (2003-2006).
656 Euro-Med Participatory Water Resources Scenarios (EMPOWERS), Egypt, Jordan, the West Bank, Gaza for CARE International, and European Community, (2003-2007).
657 "Imtidad El Mansouria Street (IMS) Closure and Pedestrianisation", In Old Cairo Touristic Area, For Aga-Khan Cultural Services, Egypt (AKCS-E), (2004).
658 “Airfield Pavement Evaluation And Safety Assessment Of Ras Shukir Airstrip”, Including The Preparation Of Design Drawings For Repair Works And Tender Documents, Gulf Of Suez Petroleum Company - GUPCO, Egypt, (2004).
659 "Chip Design For A Voltage Regulator For The Automotive Industry", For Avanquest (USA), (2004-2005).
660 "Assessment Of RF Capabilities Of UMC 90 Nm CMOS Technology And Development Of Design Guidelines For RF Components UMC", Taiwan, (2004-2005).
661 "Design And Implementation Of The MAC Layer Of Wimax Transceiver Based On IEEE 802.16d Standard", For Wilan (Canada), (2004-2005)
662 "Sewage Of Rainwater For Ramsis Axis. Cairo Governorate" For Ministry Of Housing, (2004-2005).
663 Consultation Services For Communication And Information System, For Eastern Company, (2004-2005).
664 Preparation Of The Environmental Register For Many Industrial Companies, (2004-2005).
665 "General Technical Review Covering Steam Boilers, Steam And Condensate Networks" For The Eastern Company, (2004-2005).
666 Evaluation Of Pollution From China And Refractories Furnaces, For General Company For China And Refractories, (2004-2005).
667 Testing Of Natural Gas Filling Values In Natural Gas Tanks, Car Gas, 2003-2004.
668 Design And Fabrication Of Condensate Recovery Systems, Hathour Factory For Juces And Jams, Industrial District Kift City, Kena, Seem Project, (2004-2005).
669 Supply And Installation Of Automatic Solar Burner, Control Devices And Insulation Of A Boiler, (2004-2005).
670 . Modification Of Heating Methods For Method Cost Iron Holding Furnaces To Work With Natural Gas El-Nasr Casting Company, 2004-2005).
671 Ideal Methods For Liquid Waste Treatment For Euro Company For Modern Paint, 2004-2005).
672 Design And Manufacturing Of Model Spare Parts Eastern Company, 2004-2005.
673 Design, Manufacturing And Supply Of Operation And Automatic Control Systems For Smoke Preparation Department Equipment, Eastern Company, 2004-2005.
674 "Design And Manufacturing Minced Smoke Feed Unit Project With All Its Accessories And Operation And Automatic Control System Talbia Factory, Eastern Company, 2004-2005.
675 Studies For Electricity Companies, Several Companies, 2004-2005).
676 Rehabilitation And Maintenance Of Central Air Conditioning System For Arab Company For Distribution Building, Arab Company For Distribution, 2004-2005.
677 Auditing Of Air Conditioning System For Central Control Of Communication Networks Building HEWLETT PACKARD, 2004-2005.
678 Sun Prism Factory In Free Zone, Ismailia, Sun Prism Company, 2004-2005.
679 “Luxor International Airport, Egypt Pavement Rehabilitation Project: Assessment Of Pavement Damage & Recommendations For Repair”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2004-2005
680 “Evaluation Of Concrete Apron And Recommendation For Repair – Abu Simble International Airport”, For General Nile Company For Road Construction, 2004-2005.
681 "Design Of Magrour Gerza Canal And Pump Station, Kuwait Egyptian Company For Land Reclamation, 2004-2005.
682 "Design Of Ground Reservoir And Its Accessories", For Mokhtar Ibrahim Co., 2004-2005.
683 "Central Library – Monofia University, Arab Contracting Company", 2004-2005.
684 "Youth Housing Project In Mokattam, Construction And Engineering Company", 2004-2005.
685 "Completing Work In Building No 1 Zahraa El Maadi, Construction And Engineering Consultation Company", 2004-2005.
686 "Updating Data And Measurement For Environmental Registers In Eastern Company Factories", 2004-On Going.
687 "Studies About Protection Of Urban Communities From Sand Dunes And Sand Drift", Academy Of Scientific Research And Technology, 2004- Now
688 "National Road Safety Programme", Sponsored By DRTPC Cairo University For The National Road Safety Board, 2004-Now
689 "Evaluation Of Airfield Pavements According To ICAO Standards For Nine International Airports In Egypt”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2004–Now.
690 “Airfield Pavement Evaluation & Identification Of PCN Value, Al-Alamain International Airport”, For The International Airport Company (S.A.E), 2005.
691 “Road And Drainage Design Drawings And Tender Documents, PFG- Synthetic Powder Production Plant”, For Orascom Construction Industries, 2005.
692 "Preliminary Cost Estimate Of Al Azhar Underground Park & New Urban Plaza, For Aga-Khan Cultural Services", Egypt (AKCS-E), 2005
693 “Upgrade And Maintenance Of Mansoura Airbase”, For The Egyptian Air Force, 2005.
694 "Design And Fabrication Of 10 PLC Industrial Control System For Upgraded Cigarette Packaging Lines (Type SASIB 6000)", 2005.
695 "Design Fabrication And Installation Of An Industrial Control System Consisting Of 3 PLC Based Cabinets Centrally Controlled From A Host Computer For The Tobacco Processing Factory No 2 In Giza", 2005
696 "Design Of Pavement Rehabilitation Works For Almaza Airbase”, For Washington CONTRACK", 2005
697 "Consultation Services For The Development Of The IT System Of The Company", 2005-2006.
698 "Establishing Environmental Register, Updating Data And Measurement", for Environmental Registers In Eastern Company Factories, Third Stage, 2005-2006.
699 "Traffic Impact Study Of Area Activity Development In Ghernata City", For Masr El-Gedida Company, Cairo, 2005-2006.
700 “Aswan International Airport, Egypt, Pavement Rehabilitation Project Assessment Of Pavement Damage & Recommendations For Repair”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2005-2006.
701 “Zeit Bay Airstrip, Evaluation And Repair Project, PHASE 1, Pavement Assessment Study”, For Suez Oil Company, 2005-2006.
702 “The proposed project (under negotiation) on “Sustainable Transport Project in Egypt”, to be sponsored by the Global Environment Facility (GEF) and the United Nations Development Programme (UNDP) in Cairo for the Ministry of the Environment, 2005-2006.
703 "Airfield Upgrade Project- Runway 04R-22L Extension & Construction Of New Apron 5 - Sharm El Sheikh International Airport, Egypt,”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2005-2006.
704 “Construction Supervision: Construction Of New Apron 5 - Sharm El Sheikh International Airport, Egypt”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2005-2006.
705 "Design And Manufacturing Of Mechanical Model Spare Parts Eastern Company, 2005-2006.
706 "Design And Manufacturing Of Electrical Model Spare Parts Eastern Company", 2005-2006.
707 "Environmental Measurements And Environmental Register For Different Companies And Factories, 2005-2006.
708 "Environmental Measurements for Energy Conservation And Environment Protection Project", Different Factories And Companies, 2005-2006.
709 "Comprehensive Technical Auditing Of Boiler And Steam Systems," Eastern Company, 2005-2006.
710 "Testing Of Natural Gas Filling Values In Natural Gas Tanks", Different Factories And Companies, 2005-2006.
711 "Treatment Of Industrial Wastewater For Eastern Company", Financed By Eastern Company, 2005-2006.
712 "Implementation Of A Comprehensive System For Direct And Continuous Monitoring Operation Variables And Data Processing For Performance Follow Up Of Steam Boilers", Eastern Company, 2005-2006.
713 "Studies and Consultations In The Field Of Electric Power" in a Number Of Companies And Factories, 2005-2006.
714 "Preparation Of Design Specifications For The Mechanical Ventilation System In Panel Assembly Hall In ABB Company and Periodic Follow Up Of Implementation", ABB Company, Arab Contractors, 2005-2006.
715 Evaluating the Steel Sheet Factory, El-Ezz for Steel – The free zone at el-ein el-sokhna", for the General Authority for Investment and Free Zones, 2005-2006.
716 "The Initiation Water Network In "El Amar El Kobra" Village, Mokhtar Ibrahim Company, 2005-2006.
717 "Development Of Human Resources For Lybian Professionals", Lybia, 2005-2006.
718 "Development Of Human Resources In The Field Of Advanced Technologies", Advanced Technology Center, Faculty Of Engineering, Cairo University, 2005-2006.
719 "MAC layer design and implementation of the CDMA-DO standard", for Via Telecom USA, 2005-2006.
720 "Design and implementation of the physical layer for a Bluetooth Transceiver, including VHDL code design", for Firstpass, USA", 2005-2006.
721 Feasibility Studies and Proposed Design For Vital Projects In Shorouk City, Hassan Allam Contractor Company, 2005-2006.
722 "Design And Preparation Of Documents And Technical Specifications For Consultation Services For New Free Zones Deresa, Reswa, Kift)" for General Organization for Investment, 2005-2006.
723 Planning, Design And Supervision On The Implementation Of Tiba Mearag Project, For Egyptian Kuwait Company For Building Development, 2005-2006
724 “Construction Of The Building Of The Faculty Of Air Control, 6 October Airport”, For The Organization Of National Institute For Training On Civil Aviation, Egypt, 2005-2006
725 “Traffic Impact Study of A Shopping Mall In Hadayek El-Ahram, Giza", 2006.
726 "Design and implementation of the MAC layer for Wireless USB standard", for Wipro, India, 2006 – Now.
727 "Design and implementation of applications to be used for WiFi products", for New Logic, Austria, 2006 – Now.
728 "Chip design for a Voltage Controlled Oscillator to be used for a Bluetooth transceiver", for New Logic, Austria, 2006 – Now.
729 “Azhar Underground Parking Garage Traffic Studies And Design Services”, In Old Cairo Touristic Area, For Aga-Khan Cultural Services, Egypt (AKCS-E), 2006-Now.
730 “Pavement Repair Project For The Main Runway At Hurghada International Airport – Evaluation, Tendering, And Construction Supervision”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2006-Now.
731 “Construction Supervision: Main Runway Pavement Repair Project At Aswan International Airport” , For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2006-Now.
732 “Construction Supervision: Airfield Pavement Repair Project At Luxor International Airport” , For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2006-Now.
733 Zeit Bay Airstrip, Evaluation And Repair Project, PHASE 2, Detailed Engineering For Pavement Repair”, For Suez Oil Company, 2006-Now).
734 “Zeit Bay Airstrip, Evaluation And Repair Project, PHASE 3, Supervision For Pavement Repair”, For Suez Oil Company, 2006-Now).
735 “Pavement Repair Project For The Concrete Apron At Abu Simble International Airport – Evaluation, Tendering, And Construction Supervision ”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2006-Now.
736 “Al Azhar Park Urban Plaza Project, Traffic Studies And Design Services, Traffic, Parking Supply Analysis And Parking Entrance/Exit Design”, For Aga-Khan Cultural Services, Egypt (AKCS-E), 2006-Now).
737 “South Matrouh Airstrip, Evaluation And Repair Project, PHASE 1, Pavement Assessment Study”, For Khalda Petroleum Company, 2006-Now.
738 “South Matrouh Airstrip, Evaluation And Repair Project, PHASE 2”, Detailed Engineering For Pavement Repair” For Khalda Petroleum Company, 2006-Now.
739 “South Matrouh Airstrip, Evaluation And Repair Project, PHASE 3, Pavement Assessment Study” For Khalda Petroleum Company, 2006-Now.
740 “Supervision For Development Works Of Borg El Arab International Airport”, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2006-Now.
741 “Supervision for Upgrade Of Hydrant Line Of Sharm El Sheikh International Airport, Egypt” For Petrojet Company, 2007-Now.
742 “Terminal Building 2, Pavement Maintenance for Concrete Apron”, For Cairo Airport Company”, In Cooperation with ECO Engineering Consultants, 2007-Now.
743 Pavement Repair Project For The Main Runway At Sharm El Sheikh International Airport – Evaluation, Tendering, And Construction Supervision”, For The
744 R&D Activity Title: Design and Development Of A Pc-Based Doppler Ultrasound Imaging System, For Industrial Modernisation Centre, 2007-Now.
745 R&D Activity Title: Design and Development Of A High-End Beamformer For Ultrasound Imaging Applications, For Industrial Modernisation Centre, 2007-Now.
746 746. Environmental Measurements for different industrial facilities to examine their environmental compliance with the Law 4/1994, 2007 – Now.
747 Test and Calibration of Safety Gaz Relief Valves for Compressed Natural Gaz Stations and Gas Companies under British and American Standards, For Egypt Gas Company, Car Gas, Shell, 2007-Now.
748 Methane Concentration Measurements in landfill of Sharkia Governorate, SEKEM Holding Company, 2007-Now.
749 Measurements, Egypt Otsuka Pharmaceutical Company, 2007-Now.
750 Soil Boarings For The Site Of The Construction Of The Ministry Of The Environment, New Cairo, For Ministry Of Environment, 2007-Now.
751 Assessment of Air Conditioning System of the Main Hall of the touristic boat Escarapées, for the Owner Company, 2007-Now.
752 Design And Manufacturing Of Ideal Mechanical Spare Parts, For Eastern Company, 2007-Now.
753 Provision And Installation Of Electric Spare Parts, For Eastern Company, 2007-Now.
754 Cooperation Protocol for Consultancy Services in Petroleum Engineerings, For the Financial Development & Investment Holding Company, 2007-Now.
755 Engineering Consultancy Services for Main Runway Extension and Upgrade Project of Nozha Airport, For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2007-Now.
756 High Frequency Communications Systems, 2007-Now.
757 Embedded Communications Systems, 2007-Now.
758 Design of DSP Systems, 2007-Now.
759 Additional Designs for the Sanitary and Industrial Seaware in the Free Zone Derissa and Raswa, Port Said, for the General Authority for Investment, 2007-Now.
760 Design Of Traffic Circulation, Pedestrian Movement Signing And Marking in The Premises of Obour Company For Paint And Chemical Industries (PACHIN)”, for Obour Company for Paint And Chemical Industries (PACHIN), 2007-Now.
761 Supervision of the Connection Operation between the buildings of 6th October Airport, For The Organization Of National Institute For Training On Civil Aviation, Egypt, 2007-Now.
762 Engineering Consultancy Services for the Design & Tendering of New Terminal Building, Asuit International Airport For The Egyptian Airport Company, Egyptian Holding Company For Airports And Air Navigation, Ministry Of Civil Aviation, Egypt, 2007-Now.
763 Evaluation of Earth Embankment works for Jamasa – Mansoura Road, (Segment 3), ?Société Egyptienne d'Entreprises (SEDE), 2007- Now.
764 Study and Design of Protection Works for King Khaled University, Abha, Saudi Arabia, from flash flood hazards and rain water drainage, for Al Esteshareyoon Zuhair Fayez Partnership, 2007-Now.
765 Updating of the date of environmental analysis in factories of Eastern Company, 2008-Now.
766 Testing and examination of safety valves in Aigesna Engineering, 2008-Now.
767 Measurements and environmental analysis in Nag'a-Hammadi for fiber-Dishna , Quena Governorate . 2008-Now.
768 Two boiler examination in P&J- Sadat Industrial City, 2008-Now.
769 Calibration of Safety valves and pressure gauss in seven stations – NatGas Co. 2008-Now.
770 Environmental Register and Occupational health measurements in Eroglu Egypt Co., 2008-Now.
771 Boilers exhaust gas analysis at Egypt Otsuka Pharmaceutical Co.
772 HVAC Design of Luxor culture palace theatre, Elevator Design of Luxor culture palace -
HVAC Design of Damanhour , Elevator Design of Damanhour, E'mar Office for Engineering Consultants. 2008-Now.
773 Environmental Measurements at Vertical Jeans Co.
774 Environmental Measurements at TCI Sanmar Chemicals.
775 Environmental Measurements at Tamo Press Company.
776 Environmental Measurements at Befey Company.
777 Different Consulting Services, ORASCOM Company, 2008 – till now.
778 Testing of Safety Valves, Arigsa Engineering Company, 2008.
779 Supervision of the Construction of Parade Stand and Site Arrangements of the Site of October Airport, Organization of National Institute for Training on Civil Aviation, Egypt, 2008.
780 Inspection and Evaluation of two boilers (gas and Mazott), Concentrates and Juice Company, Sadat City, 2008.
781 Environment Condition Record and Environmental Testing for Occupational Health, Analysis of Waste and Impact Assessment, Arowalgo Egypt Company, 2008.
782 Studies of Damanhour Luxor Culture and Innovation Centre, Meamar Engineering Consulting Office, 2008.
783 Extension of (Tiba El- Meerag) Contract, Egyptian Kuwaiti Company, March 2008.
784 Environmental measurements of International 'Sabaa' Company for Textiles, 2008.
785 Environmental measurements of El-Nahr El-Khaled Company, 2008
786 Preparation of Technical specifications and tender document of boilers and feed water treatment plant – Eastern Company, Six of October factory, 2008.
787 Environmental measurements of Bristol Mayer Squib Egypt Company, 2008
788 Testing of Pipes and Check of Safety Valves, Abu Keer Company, Alexandria, 2008.
789 Design and Tender Documents, Extension of the Main Runway as Construction of a new Apron of October Airport, Organization Of National Institute For Training On Civil Aviation, Egypt, 2008.
790 Environmental measurements of Egypt Otsuka Pharmaceutical any, 2008.
791 Environmental measurements of Suez Canal Factory, 2008.
792 Environmental measurements of Lotus for Garments Company, 2008.
793 Environmental measurements of Lotus High Tec Company, 2008.
794 Environmental measurements of Completing Egypt Company, 2008
795 Environmental measurements of Makkawi for Wheat Grinding Company, 2008
796 Research study on Urban Mobility in Greater Cairo, Trends and Prospects, Plan Bleu, 2008.
797 Design of internal and external roads and parking garages and Traffic Studies for the project of Cairo Finance and Tourism Center, 2008.
798 Total Evaluation of electromechanical and electrical works in different Buildings of People Assembly and extend to compliance of Egyptian Code, 2008.
799 Valuation of wastewater treatment and sea water desalination plants located at Sharm El Sheikh international airport site, 2008.

800 Designing, supplying and operating of two (2) control systems for two wrapping and packaging machines, Eastern Company, 2008.
801 Technical and Economical Study for the Rehabilitation of Three (3) Steam Boilers in the Main Branch of the Easter Company and Move them to the New Industrial Complex in the Six of October City, Easter Company, 2008.
802 Test of Safety Valves in Master Gas Co., Master Gas Company, 2008.
803 Review of the offering documents and determine the technical and regular supervision of the implementation of the central air-conditioning project of the new factory of Egypt Tailoring Company in 10th of Ramadan, 2008.
804 “Design and Tender Documents, Extension of the Main Runway as Construction of a new Apron of October Domestic Airport”, Organization of National Institute For Training on Civil Aviation, Egypt, 2008.
805 “Supervision of the Construction of Parade Stand and Site Arrangements of the Site of October Airport”, Organization of National Institute for Training on Civil Aviation, Egypt, 2008.
806 “Design of internal and external roads and parking garages and Traffic Studies for the project of Cairo Finance and Tourism Center”, Cairo Finance and Tourism Center, 2008.
807 “Engineering Consultancy Services for the Design, Tender Documents and Supervision of New Terminal Building at Assuit International Airport”, DRTPC for the Egyptian Airport Company, Egyptian Holding Company for Airports and Air Navigation, Ministry of Civil Aviation, Egypt, 2008.
808 “Pre-Tender Consultation Studies and Services”, Tendering Department, ORASCOM Construction and Industries, 2008.
809 Supervision of electromechanical of fire tank, ABB Arab Factory "10th of Ramadan City", ABB Arab Co., 2009.
810 Boilers exhaust gas analysis at Egypt Otsuka Pharmaceutical Company, 2009.
811 Technical Study for reducing pressure stations of natural gas, House Gas Company, 2009.
812 Dr. Sameh
813 Smoke Pollution Measurements from Buses, Trucks and Cranes for Halem Co-operation, Halem Co-operation, 2009.
814 Technical Study for Protection of White Cement Factory, Minia Governorate from Flash Floods, Suez Cement Co., 2009.
815 Revision of HVAC design for Low Voltage assembly factory (EG Mode) ABB Arab Factory "10th of Ramadan city" , ABB Arab Co., 2009.
816 Updating of the data of environmental analysis in El Mohandes National Co." Befey Factory", 2009.
817 Updating of the data of environmental analysis in Tamo Press Company, 2009.
818 Environmental measurements of Redembix Press Company " Suez Pack", 2009.
819 The Preparation of Tender Document, Technical Specifications, and Schematic Drawing, and the Supervision of the HVAC System of PM Factory in the Industrial Complex of Eastern Company, Six of October, 2009.
820 The Preparation of Tender Document, Technical Specifications, and Schematic Drawing, and the Supervision of the Executing Co. - Industrial Complex of Eastern Company, Six of October, 2009.
821 Updating the Data and the Measurements of the Environmental Register, the Sixth Stage, for the Main Branch and the Other Branches - Eastern Company, 2009.
822 Pavement Classification Number Indentification (PCN) of value for October Airport, Organization of National Institute for Training on Civil Aviation, Egypt, 2009.
823 HVAC design & Supervision for the main building with Delmar for touristic Investment - Hotel Porto Marina - North Coast, 2009.
824 “Airfield Pavement Evaluation & Identification of PCN Value, October Domestic Airport”, DRTPC for the Egyptian Aviation Academy, Ministry of Civil Aviation, Egypt, 2009.
825 “Identification of Pavement Classification Number (PCN)”, for October Airport, Organisation of National Institute for Training on Civil Aviation, Egypt, 2009.
826 Detailed Design Drawings, Roads & Drainage works", Sidi Krir Thermal Power Plant Project”, DRTPC for ORASCOM Construction and Industries, 2009.
827 Detailed Design Drawings, Roads & Drainage works", El-Tebbin Thermal Power Plant Project”, DRTPC for ORASCOM Construction and Industries, 2009.
828 Bread Production Line, Egyptian for Distribution and Services, January 2010.
829 Oil Recovery from Drilling Waste, Egyptian Drilling Facilities, March 2010.
830 Air Conditioning, Ventilation and Humidification, Swiss Garments Company SGC, February 2010.
831 Fire Fighting System, Swiss Garments Company SGC, March 2010.
832 Emission From Water - Tube Boiler in Egyptian Sugar and Integrated Industries Company, Egyptian Sugar and Integrated Industries Company, March 2010.
833 Design of Electromechanical Trades (Palm Hills Project)و Building Systems CO. Sahara, 24 August 2010.
834 Periodic Supervision - Polaris Roads - 6 October, EDGE for Construction & Industry, 6 July 2010.
835 Gamsha Bay Project, Temp Access Road Design & Supervision, DAMAC Gamsha Development SAE, 9 September 2010.
836 Rehabilitation of HVAC Systems, National Telecommunication Institute, 19 September 2010.
837 Enviromental Impact Study, Gamsha Temp Road, DAMAC Gamsha Development SAE, 11 October 2010.
838 Assessment of the Design of TB3 Apron Area-Cairo International Airport, Cairo International Airport, 31 October 2011.
839 HVAC System Evaluation of Sohag Hospital, Tiba Engineering & Contracting, 3 November 2010.
840 Alexandria Petroleum Maintenance Co-(Petromaint), Sharm ElSheikh Airport, Apron 3 Hydant line Design & Supervision, 21 November 2010.
841 Traffic Impact Study, Damac Park Avenue, Damac-Egypt, 21 December 2010.
842 “Evaluation of Technical Proposals of Airport City Project in Cairo International Airport”DRTPC for Egyptian Holding Company for Airports and Air Navigation (EHCAAN) 2010.
843 “Detailed Design Drawings, Road & Drainage Works for CP-123, El Ain El Sokhna Supercritical”, DRTPC for ORASCOM Construction and Industries, 2010 .
844 Road Design - Mansour Chevorlet Polaris, EDGE for Construction & Industry, 9 January 2011.
845 Elevator Testing & Review, El-Waly Co. for Construction & Urban, 24 January 2011.
846 Reveiw and Supervision of Esclator & Elevator, Concrete Co. for Ready Made, 10 February 2011.
847 Road & Drainage Design, Sidi Krir Power Plant, ORASCOM Construction Industries, 27 February 2011.
848 HVAC System Review in Interpharm, Interpharm for Medical Industries, 17 March 2011.
849 Environmental Impact Assessment Study EIA, ElMarakby for Metalic Industries, 4 April 2011.
850 Paints Upgrade and Crack Repair at the Academic Building - Egyptian Aviation Academy, Ministry of Civil Aviation - Egyptian Aviation Academy, 29 May 2011.
851 KPC Salam Base New MESS Building, Camp Master Plan & Mosque & Dining Hall, Khalda Petroleum Company, 19 June 2011.
852 Technical Consultation and Supervision, Arabia Group, 1 August 2011.
853 Technical Consultation and Supervision, Arabia Group(1), 1 August 2011.
854 Mansaura - Gamasa Road - Section 1 - Pavement Evaluation, Egyptian Construction Company "Mokhtar Ibrahim", 2 August 2011.
855 Spatial Planning for Cairo Airport Area - Contract Supervision, Egyptian Holding Company for Airports and Air Navigation, 8 August 2011.
856 Anglo - American Hospital Rehabilitation of Electrical Switch Boards, Anglo - American Hospital, 14 August 2011.
857 Structural Evaluatioin of Ras-Bakr Gas Plant Concrete Foundations, Gulf of Suez Petroleum Company, 17 August 2011.
858 Hasan Mohamed Alam, 25 August 2011.
859 Elevators Examinations, Challenger Elevator Company, 5 December 2011.
860 Air Conditioning of Factories (3) , (4), Eastern Company, 17 December 2011.
861 “Road Design – Mansour Chevorlet Polaris, 6th October”, DRTPC for EDGE Construction & Industry, 2011.
862 “Detailed Design Drawings, Road Diversion works”, Giza North 1500 MW Combined Cycle Power Project”, DRTPC for ORASCOM Construction, 2011.
863 Air Conditioning of Factory (1) , (2), Eastern Company, 18 February 2012.
864 Planning & Design of the Service Areas (ISO Feddans of Housing Development in Sherouk City), NASR Contracting COmpany (Hassan Allam), 1 April 2012.
865 Design of a Housing Complex (Sheraton Area Heliopolis), NASR Contracting COmpany (Hassan Allam), 2 April 2012.
866 Appraisal of Hyde Park Project Status, Housing and Development Bank, 10 April 2012.
867 Air Conditioning of Factory (7) , (8), Eastern Company, 28 April 2012.
868 Ras Shkeir Heliport Renovation & Upgrade Project, Gulf of Suez Petroleum Company, 25 June 2012.
869 E/A Sulphonation Plant, Henkel, Environics, 7 July 2012.
870 Supervision Works - Main Runway of Taxiusings Upgrade Project - Stape 1, Egyptian Holding Company for Airports and Air Navigations, 12 July 2012.
871 Design & Supervision of Construction, Nasser Social Bank, 15 July 2012.
872 Supervision of Main Runway Pavement Repair - Taba Airport, Nile Company for Roads & Bridges, 29 September 2012.
873 Mars Egypt Factory 6th of October City HVAC System, Mars Egypt for Manufacturing.
874 Feasubility Study for Healthy Water Plant, Prison Sector, 4 November 2012.
875 Joint protocol of cooperation with the General Authority for Tourism Development on cooperation in the field of current and future airports, the General Authority for Tourism Development, November 13, 2012.
876 Technical Study of The Burner Performance - Heating Equipment - Badr Factory, National Pipe Company, 14 February 2013.
877 Development of Ministry of Finance workers Hospital, Incometax Ministry of Finance, 25 February 2013.
878 Elevators Inspection / Company of Electricity, Challenger Elevator Company, 27 March 2013.
879 Chilled Water Piping Network Inspection, Al Ahram, April 2013.
880 Enviromental Measurements, Cairo Oils and Soap Company, 15 April 2013.
881 Standby Generator - Selection & Tender Documents Preparation, Masr Iran Company, 18 April 2013.
882 Design Services for Roads & Drainage Networks in Connection with the CP-102 Scope of Work for Banha Power Station 750MW Combined Cycle Project, Archirodon Construction Co. SA. North Africa, 1 June 2013.
883 Crack Repair Studies for October Airport utility Buildings and Hangars,Egyptian Aviation Academy, 4 June 2013.
884 Fire Fighting System of ETC Factory 10th of Ramadan, 6 June 2013.
885 Runway O5L-23R Upgrade Project - Cairo International Airport, Egyptian Holding Company for Airports and Air Navigation, Cairo Airport Company, 9 June 2013.
886 Rehabilitation of Mechanical Ventilation System for the Parking Zone - Level 8, Misr Iran for Touristic & Administration Projects, 1 July 2013.
887 Lake Nasser - Nubia Sediment Extraction and Utilization Study, Nile Water Sector, 15 July 2013.
888 Fire Fighting Rehabilitation, Swiss Company for Cotton Garments, 30 July 2013.
889 Tech. Evaluation of Passangers Elevator, Cairo Electricity Production Company, 6 August 2013.
890 Soil Report of Youth Center, Aswan, 13 August 2013.
891 R.E. Appraisal, Rod El Farag property Several Units, Owner : Arab Contractors Insurance Fund, 24 September 2013.
891 R.E. Appraisal of Dar-Alsalam Property, Dar AlSalam for R.E. Development Company, 22000m2 land, 10 December 2013.
892 R.E. Appraisal of 1500 Feddans, Future Company, 15 January 2014.
893 Measurements for Environment Compliance, Cairo for Oil & Soup, 30 January 2014.
894 Improving Energy Efficiency of Lighting and Other Building Appliances (IEEL&A), GEF/UNDP Project, 24 September 2014.
895 Air Conditioning of tobacco factory in the first floor of western pre-processing building in the industrial complex of the sixth of October, 6 January 2015.
896 Lake Nasser - Nubia Sediment Extraction and Utilization Study, Nile Water Sector _ Extension, 18 February 2015.
897 A Study to find solutions for cooling and waste water, Egyptian Sugar & Integrated Industries Company, 15 March 2015.
898 Follow up the Implementation of Environmental Compliance, Egyptian Sugar & Integrated Industries Company, 8 Septmber 2015.